Difference between revisions of "September 30, 2015 - Fall Startup and Injector Tests"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "Injector Tests and Calendar media:150929_InjectorTestList.xlsx media:150929_InjectorTestList.pdf")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
Wednesday September 30 @ 2pm in Bldg. 87 Rm. 101
 +
 +
Arne's priorities: Nov. 9th the following things MUST be accomplished.
 +
 +
# CW beam to the inline dump 85uA from A laser, 1uA from the D laser
 +
# Wien setup for alignment of polarization to Hall-A on 5-pass
 +
# Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6
 +
# Beam matched in the inj. chicane, ready for transport into the NL.
 +
# All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane
 +
# RF calibration tool fully developed (anticipate Nov. 2-7 DAYS)
 +
# quad centering tool fully developed (anticipate Nov. 2-7 DAYS)
 +
 
Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]]
 
Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]]
 +
 +
[https://devweb.acc.jlab.org/twiki/bin/view/BTeam/BTeam20150922 September 22, 2015 B-Team notes for Fall startup]

Latest revision as of 11:33, 30 September 2015

Wednesday September 30 @ 2pm in Bldg. 87 Rm. 101

Arne's priorities: Nov. 9th the following things MUST be accomplished.

  1. CW beam to the inline dump 85uA from A laser, 1uA from the D laser
  2. Wien setup for alignment of polarization to Hall-A on 5-pass
  3. Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6
  4. Beam matched in the inj. chicane, ready for transport into the NL.
  5. All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane
  6. RF calibration tool fully developed (anticipate Nov. 2-7 DAYS)
  7. quad centering tool fully developed (anticipate Nov. 2-7 DAYS)

Injector Tests and Calendar media:150929_InjectorTestList.xlsx media:150929_InjectorTestList.pdf

September 22, 2015 B-Team notes for Fall startup