- 09:06, 10 March 2022 diff hist +94 March 10 2022: Disscussion with SRF production team to install electrode in clnrm current
- 09:04, 10 March 2022 diff hist 0 N File:Current gun aassembly and proposed final step in SRF clnrm.pptx current
- 09:04, 10 March 2022 diff hist +576 N March 10 2022: Disscussion with SRF production team to install electrode in clnrm Created page with "* We are considering lowering the electrode-insulator assembly into the gun HV chamber as the last step, but in the SRF production clean room, instead of in the tunnel or in t..."
- 08:58, 10 March 2022 diff hist +125 Update meetings
- 08:57, 10 March 2022 diff hist +93 Update meetings
- 08:56, 10 March 2022 diff hist +6 N Update meetings Created page with "* test"
- 08:55, 10 March 2022 diff hist +7 18" Photogun ala GTS
- 08:54, 10 March 2022 diff hist +60 18" Photogun ala GTS
- 16:45, 4 March 2022 diff hist +8 Electrostatic and beam dynamics simulations →R30-3:
- 15:56, 28 February 2022 diff hist 0 N File:Bubba and Ben dry fitting the electrode 03.jpg current
- 15:56, 28 February 2022 diff hist -83 Electrode current
- 15:18, 28 February 2022 diff hist +80 Anode current
- 15:04, 28 February 2022 diff hist 0 N File:200kV Gun w-CIS-ASY-R30-3 (2) iso.png current
- 15:04, 28 February 2022 diff hist +50 18" Photogun ala GTS
- 14:48, 28 February 2022 diff hist +152 CIS-ASY-R30-3 current
- 14:47, 28 February 2022 diff hist +62 CIS-ASY-R30-3
- 10:30, 25 February 2022 diff hist +1 Glassman High Voltage Power Supplies →UITF 350 kV 4.5 mA current
- 10:29, 25 February 2022 diff hist -1 Glassman High Voltage Power Supplies →CEBAF 450 kV 3.0 mA
- 10:49, 23 February 2022 diff hist 0 N File:DRAFT CIS-ASY-R30-3 build schedule.xlsx current
- 10:49, 23 February 2022 diff hist +52 Tasks current