User contributions
Jump to navigation
Jump to search
- 10:17, 16 March 2022 diff hist +2 Mar 17, 2022 - Update Meeting
- 10:16, 16 March 2022 diff hist +189 Mar 17, 2022 - Update Meeting
- 10:12, 16 March 2022 diff hist +110 Mar 17, 2022 - Update Meeting
- 10:11, 16 March 2022 diff hist +84 Mar 17, 2022 - Update Meeting
- 10:09, 16 March 2022 diff hist +153 Mar 17, 2022 - Update Meeting
- 10:08, 16 March 2022 diff hist +548 N Mar 17, 2022 - Update Meeting Created page with "==Agenda== * NEG screens - Marcy * Gun table layouts (UITF, CEBAF) - Shaun * Anode tube versions ** Shaun sent Gabriel models for the 12 narrow and for the 6 wide slot tubes *..."
- 10:02, 16 March 2022 diff hist +52 Update meetings
- 15:04, 10 March 2022 diff hist -76 Update meetings
- 14:04, 10 March 2022 diff hist 0 N File:High current polarized gun schedule + labor estimates Rev01.xlsx current
- 14:03, 10 March 2022 diff hist +77 Update meetings
- 09:06, 10 March 2022 diff hist +94 March 10 2022: Disscussion with SRF production team to install electrode in clnrm current
- 09:04, 10 March 2022 diff hist 0 N File:Current gun aassembly and proposed final step in SRF clnrm.pptx current
- 09:04, 10 March 2022 diff hist +576 N March 10 2022: Disscussion with SRF production team to install electrode in clnrm Created page with "* We are considering lowering the electrode-insulator assembly into the gun HV chamber as the last step, but in the SRF production clean room, instead of in the tunnel or in t..."
- 08:58, 10 March 2022 diff hist +125 Update meetings
- 08:57, 10 March 2022 diff hist +93 Update meetings
- 08:56, 10 March 2022 diff hist +6 N Update meetings Created page with "* test"
- 08:55, 10 March 2022 diff hist +7 18" Photogun ala GTS
- 08:54, 10 March 2022 diff hist +60 18" Photogun ala GTS
- 16:45, 4 March 2022 diff hist +8 Electrostatic and beam dynamics simulations →R30-3:
- 15:56, 28 February 2022 diff hist 0 N File:Bubba and Ben dry fitting the electrode 03.jpg current