User contributions
Jump to navigation
Jump to search
- 12:19, 2 August 2022 diff hist 0 N File:Valeria poster CalibrationMottPolarimeter summer 2022.pdf current
- 12:19, 2 August 2022 diff hist 0 N File:Valeria Calibration of a Mott polarimeter slides summer 2022.pdf current
- 12:18, 2 August 2022 diff hist 0 N File:Valeria Calibration of a Mott polarimeter paper draft summer 2022.pdf current
- 10:44, 2 August 2022 diff hist +229 JLab-keV-Mott →Documentation current
- 13:06, 1 August 2022 diff hist 0 N File:WEP20 Palacios Serrano High gradient Wien filters.docx current
- 13:05, 1 August 2022 diff hist +43 CIS Conference and Workshop Proceedings →2022
- 13:03, 1 August 2022 diff hist +23 CIS Conference and Workshop Proceedings →2022
- 12:59, 1 August 2022 diff hist 0 N File:WEEP16 Poster Hernandez-Garcia 500 kV feedthrough.pptx current
- 12:59, 1 August 2022 diff hist 0 N File:WEPA16.docx current
- 12:58, 1 August 2022 diff hist +222 CIS Conference and Workshop Proceedings
- 08:05, 22 June 2022 diff hist +127 June 22, 2022 - update current
- 08:04, 22 June 2022 diff hist +142 June 22, 2022 - update
- 08:02, 22 June 2022 diff hist 0 N File:CIS-ASY-R30-3 schedule updated June 03 2022.xlsx current
- 08:02, 22 June 2022 diff hist +1 June 22, 2022 - update
- 07:55, 22 June 2022 diff hist -155 June 22, 2022 - update
- 07:51, 22 June 2022 diff hist 0 June 22, 2022 - update
- 07:50, 22 June 2022 diff hist +51 June 22, 2022 - update
- 07:48, 22 June 2022 diff hist +2,523 N June 22, 2022 - update Created page with "'''Updates''' # Anode flange based on Injector Phase 1 but with two HV ports #* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked..."
- 07:33, 22 June 2022 diff hist +28 Update meetings current
- 09:04, 25 May 2022 diff hist +92 Screen pictures current
- 09:03, 25 May 2022 diff hist 0 N File:Wire mesh screen opposite side.jpg current
- 09:02, 25 May 2022 diff hist 0 N File:Wire mesh screen feedthrough side 02.jpg current
- 09:02, 25 May 2022 diff hist 0 N File:Wire mesh screen feedthrough side.jpg current
- 09:02, 25 May 2022 diff hist 0 N File:Wire mesh screen top view.jpg current
- 09:02, 25 May 2022 diff hist 0 N File:Wire mesh screen upstream view.jpg current
- 09:01, 25 May 2022 diff hist +228 N Screen pictures Created page with "*File:Wire mesh screen upstream view.jpg *File:Wire mesh screen top view.jpg *File:Wire mesh screen feedthrough side.jpg *File:Wire mesh screen feedthrough side..."
- 08:36, 25 May 2022 diff hist +22 May 25, 2022 - updates current
- 08:33, 25 May 2022 diff hist +1,801 N May 25, 2022 - updates Created page with "'''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a be..."
- 08:23, 25 May 2022 diff hist +28 Update meetings
- 15:18, 17 May 2022 diff hist 0 N File:CIS-ASY-R30-3 schedule updated May 16 2022.xlsx current
- 15:17, 17 May 2022 diff hist +56 May 17, 2022 - updates current
- 14:53, 17 May 2022 diff hist +187 May 17, 2022 - updates
- 14:49, 17 May 2022 diff hist +1,713 N May 17, 2022 - updates Created page with "'''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a be..."
- 14:41, 17 May 2022 diff hist +28 Update meetings
- 13:05, 16 May 2022 diff hist -1 May the 4th, 2022 -updates current
- 13:05, 16 May 2022 diff hist 0 May the 4th, 2022 -updates
- 07:45, 5 May 2022 diff hist 0 N File:Gabriel's thesis Electrostatic Design and Characterization of a 200 keV Photogun.pdf current
- 07:44, 5 May 2022 diff hist +98 Theses
- 08:45, 4 May 2022 diff hist +415 May the 4th, 2022 -updates
- 08:41, 4 May 2022 diff hist +69 Anode flange prints and pictures current
- 08:39, 4 May 2022 diff hist +1,997 N May the 4th, 2022 -updates Created page with "==Agenda== '''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* Drawing complete and sent for approval #* One zero length reducer 10" to 4..."
- 08:27, 4 May 2022 diff hist +32 Update meetings
- 08:25, 4 May 2022 diff hist 0 N File:JL0091130-0122, 2-PORT HVC END FLANGE ASSEMBLY, REV-.pdf current
- 08:25, 4 May 2022 diff hist +68 Drawings current
- 08:13, 4 May 2022 diff hist 0 N File:JL0119495-0036, 2-DEG ANODE SS SPACER, .13 THK, REV-.pdf current
- 08:13, 4 May 2022 diff hist +68 Drawings
- 08:13, 4 May 2022 diff hist 0 N File:JL0119495-0035, 12-SLOT ANODE STANDOFF, REV-.pdf current
- 08:13, 4 May 2022 diff hist +60 Drawings
- 08:12, 4 May 2022 diff hist 0 N File:JL0119495-0033, 2 DEG ANODE MACOR BUSHING, REV-, apvd.pdf current
- 08:12, 4 May 2022 diff hist +67 Drawings
- 08:12, 4 May 2022 diff hist +2 Drawings
- 08:11, 4 May 2022 diff hist 0 N File:JL0119495-0032, 2 DEG ANODE MACOR SPACER, REV-. apvd.pdf current
- 08:11, 4 May 2022 diff hist +68 Drawings
- 08:11, 4 May 2022 diff hist 0 N File:JL0119495-0031, 2 DEG BORE SHIELD, REV- apvd.pdf current
- 08:10, 4 May 2022 diff hist +62 Drawings
- 08:09, 4 May 2022 diff hist 0 N File:ACC2003000-0343, LOAD LOCK GUN D.S. BORE SHIELD, REV- apvd.pdf current
- 08:09, 4 May 2022 diff hist +74 Drawings
- 08:45, 27 April 2022 diff hist +53 April 26, 2022 - updates current
- 08:44, 27 April 2022 diff hist +29 April 26, 2022 - updates
- 08:42, 27 April 2022 diff hist +329 April 26, 2022 - updates
- 08:23, 27 April 2022 diff hist +66 April 26, 2022 - updates
- 08:19, 27 April 2022 diff hist +1 April 26, 2022 - updates
- 09:04, 26 April 2022 diff hist -1 April 26, 2022 - updates
- 09:04, 26 April 2022 diff hist +1,551 N April 26, 2022 - updates Created page with "==Agenda== '''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* Bubba i placing the order for: #*2 one zero length reducer 10" to 4-1/2" f..."
- 08:18, 26 April 2022 diff hist +30 Update meetings
- 07:39, 21 April 2022 diff hist -1 April 21, 2022 - HV chamber layout for installation in CEBAF current
- 07:39, 21 April 2022 diff hist +297 April 21, 2022 - HV chamber layout for installation in CEBAF
- 07:37, 21 April 2022 diff hist -5 April 21, 2022 - HV chamber layout for installation in CEBAF
- 07:36, 21 April 2022 diff hist +6 April 21, 2022 - HV chamber layout for installation in CEBAF
- 07:34, 21 April 2022 diff hist +387 April 21, 2022 - HV chamber layout for installation in CEBAF
- 07:10, 21 April 2022 diff hist +170 Drawings
- 07:09, 21 April 2022 diff hist +86 Drawings
- 07:05, 21 April 2022 diff hist +19 Drawings
- 07:05, 21 April 2022 diff hist -2 Drawings
- 07:04, 21 April 2022 diff hist +97 Drawings
- 07:03, 21 April 2022 diff hist -44 April 21, 2022 - HV chamber layout for installation in CEBAF
- 08:58, 13 April 2022 diff hist +245 April 13, 2022 - HV chamber layout for installation in CEBAF current
- 15:17, 12 April 2022 diff hist 0 N File:14" HV chamber CEBAF injector vacuum piping dimensions.pptx current
- 14:59, 12 April 2022 diff hist +71 April 13, 2022 - HV chamber layout for installation in CEBAF
- 12:41, 12 April 2022 diff hist -1 April 13, 2022 - HV chamber layout for installation in CEBAF
- 12:39, 12 April 2022 diff hist -54 April 13, 2022 - HV chamber layout for installation in CEBAF
- 12:32, 12 April 2022 diff hist 0 N File:CIS-ASY-R30-3 schedule updateed April 12 2022.xlsx current
- 12:31, 12 April 2022 diff hist +61 April 13, 2022 - HV chamber layout for installation in CEBAF
- 10:08, 12 April 2022 diff hist +8 April 13, 2022 - HV chamber layout for installation in CEBAF
- 10:07, 12 April 2022 diff hist +76 April 13, 2022 - HV chamber layout for installation in CEBAF
- 09:49, 12 April 2022 diff hist 0 April 13, 2022 - HV chamber layout for installation in CEBAF
- 09:36, 12 April 2022 diff hist +129 April 13, 2022 - HV chamber layout for installation in CEBAF
- 09:35, 12 April 2022 diff hist +250 April 13, 2022 - HV chamber layout for installation in CEBAF
- 09:33, 12 April 2022 diff hist +161 April 13, 2022 - HV chamber layout for installation in CEBAF
- 09:21, 12 April 2022 diff hist +936 N April 13, 2022 - HV chamber layout for installation in CEBAF Created page with "==Agenda== '''Critical path action items''' # Define if anode tube will be permanently at ground, or will be electrically isolated by April 13 # Verify HV chamber dimensions..."
- 09:08, 12 April 2022 diff hist +23 Update meetings
- 15:48, 11 April 2022 diff hist 0 N File:CEBAF Wien filters HV system operational guidelines updated April 11 2022.pdf current
- 15:48, 11 April 2022 diff hist +50 CIS OnCall and Troubleshooting →Wien Filter HV System: description, procedure and troubleshooting
- 12:14, 11 April 2022 diff hist 0 N File:Injector Phase 1 HV chamber-prep chamber top view.jpg current
- 12:14, 11 April 2022 diff hist 0 N File:Injector Phase 1 Anode flange detail 02.jpg current
- 12:13, 11 April 2022 diff hist 0 N File:Injector Phase 1 Anode flange detail 01.jpg current
- 12:13, 11 April 2022 diff hist 0 N File:CEBAF Injector Phase 1 - 14" gun left side view.jpg current
- 12:13, 11 April 2022 diff hist +239 Anode flange prints and pictures
- 12:08, 11 April 2022 diff hist 0 N File:JL0091130-0101 HVC END FLANGE ASSEMBLY, REV- apvd.pdf current
- 12:07, 11 April 2022 diff hist +133 Anode flange prints and pictures