  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked many times has been machined
    • The tubes and mini-conflate flanges for the anode and tube biasing feedthroughs are being welded, expect to be done today
  2. Screen Design
    • Bubba and Carlos used Shaun's design as a baseline, but had to change shape a bit to make sure the beaded NEG wires and feedthrough are covered
    • Next, each screen section will be UHV cleaned and vacuum fired, perhaps along with the anode parts
    • Screen pictures
  3. Define layout for installation in CEBAF injector
  4. Clean room in LERF Lab 3A
    • Clean room has been cleared off
    • Lights have been replaced
    • Next is to clean up the clean room and keep it clean
    • Carlos verified that there is nitrogen available in Lab 3A
  5. Other items


Useful documents


Updates

TEAMS meeting link sent along with invite