Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide minor edits | Hide bots | Hide anonymous users | Hide registered users | Hide my edits

Show new changes starting from 23:15, 20 October 2020
   

20 October 2020

     18:39  CIS Phase 1 work plans‎‎ (36 changes | history) . . (+3,829). . [Moser‎ (36×)]
     18:39 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     18:10 (cur | prev) . . (-3). . Moser (Talk | contribs)
     18:09 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     18:08 (cur | prev) . . (+5). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     18:06 (cur | prev) . . (+34). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     18:03 (cur | prev) . . (+76). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     18:01 (cur | prev) . . (+664). . Moser (Talk | contribs)
     17:57 (cur | prev) . . (+774). . Moser (Talk | contribs)
     17:50 (cur | prev) . . (+1). . Moser (Talk | contribs)
     17:49 (cur | prev) . . (-1). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:48 (cur | prev) . . (-3). . Moser (Talk | contribs) (Fire System Work)
     17:48 (cur | prev) . . (+1). . Moser (Talk | contribs) (Fire System Work)
     17:45 (cur | prev) . . (+3). . Moser (Talk | contribs) (Fire System Work)
     17:44 (cur | prev) . . (+129). . Moser (Talk | contribs)
     17:41 (cur | prev) . . (-17). . Moser (Talk | contribs) (Penetration Work)
     17:41 (cur | prev) . . (+1). . Moser (Talk | contribs) (Penetration Work)
     17:41 (cur | prev) . . (+16). . Moser (Talk | contribs) (Penetration Work)
     17:40 (cur | prev) . . (+64). . Moser (Talk | contribs) (Penetration Work)
     17:37 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     17:36 (cur | prev) . . (+1,333). . Moser (Talk | contribs)
     17:30 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:29 (cur | prev) . . (+36). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:27 (cur | prev) . . (-167). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:18 (cur | prev) . . (-23). . Moser (Talk | contribs)
     17:16 (cur | prev) . . (+190). . Moser (Talk | contribs)
     17:05 (cur | prev) . . (-22). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:04 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:04 (cur | prev) . . (-9). . Moser (Talk | contribs) (Week 1 (Sep 21 - Sep 27) High Voltage Testing w/ PSS lock-ups)
     17:01 (cur | prev) . . (-7). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     17:00 (cur | prev) . . (-82). . Moser (Talk | contribs)
     16:58 (cur | prev) . . (+119). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     16:49 (cur | prev) . . (+43). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     16:37 (cur | prev) . . (+2). . Moser (Talk | contribs) (Week 2 (Sep 28 - Oct 4) - Instrument, Magnet, LCW, Air, Laser disconnects)
     16:36 (cur | prev) . . (-2). . Moser (Talk | contribs)
     16:19 (cur | prev) . . (+295). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     08:29 (cur | prev) . . (+363). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23) Prep for Gun to Y Vacuum Installation)
     17:40 (Upload log). . [Chgarcia‎ (2×); Moser‎ (2×)]
     17:40 . . Moser (Talk | contribs) uploaded File:Firepipe 10 Oct Update.docx
     16:31 . . Moser (Talk | contribs) uploaded File:InjSB Week5.png
     15:19 . . Chgarcia (Talk | contribs) uploaded File:CEBAF Wien rebuild schedule updated Oct 20 2020.png
     13:35 . . Chgarcia (Talk | contribs) uploaded File:CEBAF Wien rebuild schedule updated Oct 19 2020.png
N    15:19  200kV Wien filter - FINAL‎‎ (3 changes | history) . . (+260). . [Chgarcia‎ (3×)]
     15:19 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     13:53 (cur | prev) . . (+91). . Chgarcia (Talk | contribs)
N    13:35 (cur | prev) . . (+169). . Chgarcia (Talk | contribs) (Created page with "'''Wien filter refurbishing for 200 keV beam: +/- 20kV per electron eplate and 20A/75V coils''' *Schedule *File:CEBAF Wien rebuild schedule updated Oct 19 2020.png *")
     12:29  WF Wien Filters (200 kV upgrade)‎ (diff | hist) . . (+87). . Grames (Talk | contribs)
N    08:06  PPB - Oct 21, 2020‎‎ (6 changes | history) . . (+539). . [Grames‎ (6×)]
     08:06 (cur | prev) . . (+11). . Grames (Talk | contribs)
     08:05 (cur | prev) . . (+52). . Grames (Talk | contribs)
     08:00 (cur | prev) . . (+2). . Grames (Talk | contribs)
     08:00 (cur | prev) . . (-9). . Grames (Talk | contribs)
     07:59 (cur | prev) . . (+377). . Grames (Talk | contribs)
N    07:55 (cur | prev) . . (+106). . Grames (Talk | contribs) (Created page with " '''Americas Workshop on Linear Colliders 2020''' (https://agenda.linearcollider.org/event/8622/overview)")
     07:55  PPB Meetings‎ (diff | hist) . . (+24). . Grames (Talk | contribs)

19 October 2020

N    21:08  COVID visit questions‎‎ (5 changes | history) . . (+1,564). . [Grames‎ (5×)]
     21:08 (cur | prev) . . (+55). . Grames (Talk | contribs)
     21:07 (cur | prev) . . (+246). . Grames (Talk | contribs)
     21:06 (cur | prev) . . (-6). . Grames (Talk | contribs)
     21:05 (cur | prev) . . (+388). . Grames (Talk | contribs)
N    21:00 (cur | prev) . . (+881). . Grames (Talk | contribs) (Created page with ";General requirements: :(i) there is clear benefit to the lab that can't be achieved without on-site access :(ii) the visit or meeting can be accomplished in compliance with o...")
     20:58  Students, Collaborators and Visitors‎ (diff | hist) . . (+56). . Grames (Talk | contribs)
     18:21  CEBAF Injector Upgrade‎‎ (2 changes | history) . . (+386). . [Grames‎; Moser‎]
     18:21 (cur | prev) . . (+130). . Moser (Talk | contribs) (ATLIS Tasks)
     14:15 (cur | prev) . . (+256). . Grames (Talk | contribs)
     18:14  CIS Phase 1 work plans‎‎ (10 changes | history) . . (+3,147). . [Moser‎ (3×); Grames‎ (7×)]
     18:14 (cur | prev) . . (+250). . Grames (Talk | contribs)
     18:10 (cur | prev) . . (+6). . Grames (Talk | contribs)
     18:09 (cur | prev) . . (+638). . Grames (Talk | contribs)
     13:15 (cur | prev) . . (+142). . Moser (Talk | contribs) (Fire System Work)
     13:10 (cur | prev) . . (+86). . Moser (Talk | contribs) (Fire System Work)
     12:45 (cur | prev) . . (+26). . Moser (Talk | contribs)
     08:12 (cur | prev) . . (+3). . Grames (Talk | contribs)
     08:11 (cur | prev) . . (+107). . Grames (Talk | contribs)
     08:08 (cur | prev) . . (+1,245). . Grames (Talk | contribs)
     08:05 (cur | prev) . . (+644). . Grames (Talk | contribs)
     15:02  October 9, 2020 Meeting Minutes‎ (diff | hist) . . (+1,218). . Yoskowij (Talk | contribs)
     14:33  CIS Conference and Workshop Proceedings‎‎ (4 changes | history) . . (+540). . [Grames‎ (4×)]
     14:33 (cur | prev) . . (+105). . Grames (Talk | contribs)
     14:10 (cur | prev) . . (+159). . Grames (Talk | contribs)
     13:35 (cur | prev) . . (+109). . Grames (Talk | contribs)
     13:34 (cur | prev) . . (+167). . Grames (Talk | contribs)
     14:24  PSS Kicker (upgraded for 200 kV upgrade)‎‎ (4 changes | history) . . (+133). . [Grames‎ (4×)]
     14:24 (cur | prev) . . (-2). . Grames (Talk | contribs)
     14:24 (cur | prev) . . (-9). . Grames (Talk | contribs)
     14:23 (cur | prev) . . (+31). . Grames (Talk | contribs)
     14:20 (cur | prev) . . (+113). . Grames (Talk | contribs)
     14:21 (Upload log). . [Grames‎ (2×); Poelker‎ (2×)]
     14:21 . . Grames (Talk | contribs) uploaded File:PSS Kicker Magnet Design-V03-Lakshmi-201019.pdf
     14:11 . . Grames (Talk | contribs) uploaded File:Trotta Nicholaus JA FINAL.pptx
     11:25 . . Poelker (Talk | contribs) uploaded File:Things to do between runs1 and 2.pdf
     11:24 . . Poelker (Talk | contribs) uploaded File:HDIce status report ahead of run2.pdf
     11:25  UITC meeting minutes‎‎ (2 changes | history) . . (+99). . [Poelker‎ (2×)]
     11:25 (cur | prev) . . (+49). . Poelker (Talk | contribs)
     11:24 (cur | prev) . . (+50). . Poelker (Talk | contribs)

16 October 2020

     15:35 (Upload log). . [Grames‎; Suleiman‎ (5×)]
     15:35 . . Suleiman (Talk | contribs) uploaded a new version of File:UITF 200keV Mott DAQ Oct16 2020.pdf
     12:59 . . Grames (Talk | contribs) uploaded File:201016 200 keV Mott Scattering Chamber Progress.pptx
     09:51 . . Suleiman (Talk | contribs) uploaded a new version of File:UITF 200keV Mott DAQ Oct16 2020.pdf
     09:02 . . Suleiman (Talk | contribs) uploaded a new version of File:UITF 200keV Mott DAQ Oct16 2020.pdf
     09:01 . . Suleiman (Talk | contribs) uploaded a new version of File:UITF 200keV Mott DAQ Oct16 2020.pdf
     08:56 . . Suleiman (Talk | contribs) uploaded File:UITF 200keV Mott DAQ Oct16 2020.pdf
     12:59  Robust Meeting - Oct 16, 2020‎‎ (3 changes | history) . . (+102). . [Suleiman‎; Grames‎ (2×)]
     12:59 (cur | prev) . . (-6). . Grames (Talk | contribs)
     12:58 (cur | prev) . . (+61). . Grames (Talk | contribs)
     08:56 (cur | prev) . . (+47). . Suleiman (Talk | contribs)
     09:27  CIS Phase 1 work plans‎‎ (2 changes | history) . . (-33). . [Moser‎ (2×)]
     09:27 (cur | prev) . . (-35). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     08:59 (cur | prev) . . (+2). . Moser (Talk | contribs)

15 October 2020

     17:10  CIS Phase 1 work plans‎‎ (8 changes | history) . . (+1,115). . [Moser‎ (8×)]
     17:10 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23))
     16:57 (cur | prev) . . (-14). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     16:55 (cur | prev) . . (-33). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23))
     16:54 (cur | prev) . . (+9). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23))
     16:54 (cur | prev) . . (-1). . Moser (Talk | contribs) (Week 5 (Oct 19 - Oct 23))
     16:53 (cur | prev) . . (+306). . Moser (Talk | contribs)
     16:47 (cur | prev) . . (+414). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     09:07 (cur | prev) . . (+434). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
N    10:41  October 15, 2020 - Weekly ME meeting‎‎ (6 changes | history) . . (+3,402). . [Grames‎ (6×)]
     10:41 (cur | prev) . . (+197). . Grames (Talk | contribs)
     08:56 (cur | prev) . . (+20). . Grames (Talk | contribs)
     08:55 (cur | prev) . . (-2). . Grames (Talk | contribs)
     08:55 (cur | prev) . . (+62). . Grames (Talk | contribs)
     08:54 (cur | prev) . . (+33). . Grames (Talk | contribs)
N    08:26 (cur | prev) . . (+3,092). . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (fo...")
     08:16  AIPINJ - Upgrade Meetings‎ (diff | hist) . . (+42). . Grames (Talk | contribs)

14 October 2020

     14:36  CIS Phase 1 work plans‎‎ (7 changes | history) . . (+1,117). . [Moser‎ (7×)]
     14:36 (cur | prev) . . (+111). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     14:22 (cur | prev) . . (+327). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     13:58 (cur | prev) . . (+75). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     13:57 (cur | prev) . . (+2). . Moser (Talk | contribs)
     13:56 (cur | prev) . . (+156). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     09:05 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
     09:04 (cur | prev) . . (+445). . Moser (Talk | contribs) (Week 4 (Oct 12 - Oct 18) Cable Pulls and Y-Chamber Girder Rebuild)
N    14:25  Tunnel Photos Oct14 2020‎ (diff | hist) . . (+159). . Moser (Talk | contribs) (Created page with " 1000px 1000px 1000px")
     14:18  CEBAF Injector Upgrade‎ (diff | hist) . . (+1). . Moser (Talk | contribs) (Quick Links)
     14:17 (Upload log). . [Grames‎; Moser‎ (11×)]
     14:17 . . Moser (Talk | contribs) uploaded File:Oct14 Chopper LookingUpstream.JPG
     14:17 . . Moser (Talk | contribs) uploaded File:Oct14 Ychamber LookingDownstream.JPG
     14:17 . . Moser (Talk | contribs) uploaded File:Oct14 Gun2 LookingDownstream.JPG
     14:04 . . Moser (Talk | contribs) uploaded File:Pene108.JPG
     14:04 . . Moser (Talk | contribs) uploaded File:Pene135.JPG
     14:04 . . Moser (Talk | contribs) uploaded File:Pene86.JPG
     14:04 . . Moser (Talk | contribs) uploaded File:PeneLH.JPG
     14:04 . . Moser (Talk | contribs) uploaded File:Pene58.JPG
     13:51 . . Moser (Talk | contribs) uploaded a new version of File:InjSB Racks.png(Reverted to version as of 17:50, 14 October 2020)
     13:50 . . Moser (Talk | contribs) uploaded a new version of File:InjSB Racks.png
     13:50 . . Moser (Talk | contribs) uploaded a new version of File:InjSB Racks.png
     06:56 . . Grames (Talk | contribs) uploaded File:201014 PositronsBeam z Phase Energy.pptx
N    14:13  Penetration135‎ (diff | hist) . . (+131). . Moser (Talk | contribs) (Created page with "Entrance: IN03B17 Exit: Above middle of 0L03 cryomodule (first full zone) 1000px file:InjSB Racks.png")
N    14:12  Penetration108‎ (diff | hist) . . (+123). . Moser (Talk | contribs) (Created page with "Entrance: IN03B04 Exit: Above harp IHA0L03, just before PSS fence 1000px file:InjSB Racks.png")
N    14:11  Penetration86‎ (diff | hist) . . (+121). . Moser (Talk | contribs) (Created page with "Entrance: IN02B23 Exit: above MQJ0L02, just past plastic barrier 1000px file:InjSB Racks.png")
N    14:10  Penetration58‎ (diff | hist) . . (+107). . Moser (Talk | contribs) (Created page with "Entrance: IN02B10 Exit: Above buncher cavity ~0I05 1000px File:InjSB Racks.png")
N    14:09  PenetrationALH‎‎ (4 changes | history) . . (+136). . [Moser‎ (4×)]
     14:09 (cur | prev) . . (+1). . Moser (Talk | contribs)
     14:08 (cur | prev) . . (+9). . Moser (Talk | contribs)
     14:07 (cur | prev) . . (-1). . Moser (Talk | contribs)
N    14:06 (cur | prev) . . (+127). . Moser (Talk | contribs) (Created page with "Entrance: IN01B06 Exit: Above Laser hut, ~across for where Y-chamber would be. file:Pene108.JPG file:InjSB_Racks.png")
     11:03  PPB - Oct 14, 2020‎‎ (4 changes | history) . . (+139). . [Grames‎ (4×)]
     11:03 (cur | prev) . . (0). . Grames (Talk | contribs)
     11:02 (cur | prev) . . (+49). . Grames (Talk | contribs)
     06:57 (cur | prev) . . (+37). . Grames (Talk | contribs)
     06:56 (cur | prev) . . (+53). . Grames (Talk | contribs)

13 October 2020

N    22:04  PPB - Oct 14, 2020‎‎ (27 changes | history) . . (+876). . [Grames‎ (27×)]
     22:04 (cur | prev) . . (-3). . Grames (Talk | contribs)
     22:03 (cur | prev) . . (-57). . Grames (Talk | contribs)
     22:03 (cur | prev) . . (+71). . Grames (Talk | contribs)
     22:01 (cur | prev) . . (+1). . Grames (Talk | contribs)
     22:00 (cur | prev) . . (0). . Grames (Talk | contribs)
     22:00 (cur | prev) . . (-11). . Grames (Talk | contribs)
     21:59 (cur | prev) . . (-280). . Grames (Talk | contribs)
     21:57 (cur | prev) . . (-14). . Grames (Talk | contribs)
     21:57 (cur | prev) . . (+3). . Grames (Talk | contribs)
     21:56 (cur | prev) . . (-46). . Grames (Talk | contribs)
     21:46 (cur | prev) . . (+271). . Grames (Talk | contribs)
     21:43 (cur | prev) . . (+34). . Grames (Talk | contribs)
     21:39 (cur | prev) . . (+6). . Grames (Talk | contribs)
     21:39 (cur | prev) . . (+142). . Grames (Talk | contribs)
     21:32 (cur | prev) . . (+6). . Grames (Talk | contribs)
     21:31 (cur | prev) . . (-1). . Grames (Talk | contribs)
     21:31 (cur | prev) . . (+26). . Grames (Talk | contribs)
     21:29 (cur | prev) . . (+4). . Grames (Talk | contribs)
     21:28 (cur | prev) . . (-4). . Grames (Talk | contribs)
     21:28 (cur | prev) . . (+6). . Grames (Talk | contribs)
     21:25 (cur | prev) . . (+24). . Grames (Talk | contribs)
     21:23 (cur | prev) . . (-26). . Grames (Talk | contribs)
     21:23 (cur | prev) . . (-49). . Grames (Talk | contribs)
     21:23 (cur | prev) . . (0). . Grames (Talk | contribs)
     21:22 (cur | prev) . . (+28). . Grames (Talk | contribs)
     21:21 (cur | prev) . . (+131). . Grames (Talk | contribs)
N    21:19 (cur | prev) . . (+614). . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 10am, US 11am, France 5pm) Bluejeans: https://bluejeans.com/164307983 ;Topics (if we go too long, can push others to next wee...")
     21:09  PPB Meetings‎ (diff | hist) . . (+24). . Grames (Talk | contribs)