Search results

Jump to navigation Jump to search
  • * J. Grames et al., Unique electron polarimeter analyzing power comparison and precisio
    1 KB (148 words) - 10:29, 23 May 2023
  • * J. Grames, "Mott Experiment Run I/II Beam Energies" JLAB-TN-17-001 (Jan 17, 2017) [[m Jonathan Dumas, Joe Grames, and Eric Voutier [[Media:JLAB-TN-08-086.pdf]]
    2 KB (323 words) - 08:52, 13 April 2018
  • ** Dec - (Grames) 2022 End of Year Report on Positron R&D
    986 bytes (134 words) - 14:12, 15 March 2022
  • ...Covert, Phil Adderley, Riad Suleiman, John Hansknecht, Marcy Stutzman, Joe Grames.]]
    1 KB (172 words) - 19:03, 29 May 2014
  • :* J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 G
    925 bytes (129 words) - 12:53, 18 April 2023
  • ...tes/CIS/Shared%20Documents/Grames%20-%20share%20space?csf=1&web=1&e=THA65B Grames - share space]
    1 KB (206 words) - 10:32, 13 June 2023
  • ...tiarenko, J. Kowal, J. Musson, S. Philip, M. Tiefenback, K. Welch, (Ed. J. Grames) "Some Practical Considerations for a Positron Source and Positron Beam Ope
    971 bytes (123 words) - 20:07, 28 February 2023
  • ** Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source ** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 G
    2 KB (320 words) - 08:29, 7 February 2023
  • ...he Haimson coil corrector was not steering the beam properly. Later on Joe Grames and Yan Wang discovered it was wired up as a quad. They corrected the probl
    1 KB (181 words) - 14:46, 21 June 2016
  • # Production of High Bunch Charge at UITF Grames [[media:UITF high bunch charge_Grames and Jiquan version2.pptx]]
    1 KB (178 words) - 09:34, 14 January 2019
  • ....org/ciswiki/index.php/UITF_Meeting_-_March_18,_2016 See links to UITF and Grames talk, last slide]
    895 bytes (156 words) - 11:49, 14 January 2020
  • * TBD - Kuriki-san or Grames - 3 GeV e- driven source for ILC
    1 KB (145 words) - 14:40, 24 February 2021
  • :: Positrons at FFA@CEBAF - discussion with Joe Grames
    1 KB (148 words) - 10:10, 14 April 2021
  • * J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 G
    1,015 bytes (142 words) - 07:30, 4 January 2023
  • ...oval; CIS: Tiny magnet removals || CIS; Adderley: Aperture+Cups Air/Water; Grames: Mech Install Walk-Thru || S&A: Gun
    1 KB (167 words) - 08:05, 5 October 2020
  • [[media:200815_uitf_layout.ods]] Historical Survey Data from Joe Grames
    1 KB (178 words) - 12:32, 14 April 2022
  • ** Joe Grames (20+5) - Ce+BAF concept and the challenging polarized e- source ** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 G
    3 KB (476 words) - 12:02, 8 February 2023
  • # All drawings are in: M:\bubble\grames\JLAB_Released_Bubble_Drawings
    1 KB (157 words) - 11:32, 6 November 2014
  • ** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 G
    1 KB (156 words) - 18:33, 24 January 2023
  • '''[[Joe Grames]]''' (Group Leader) x7097
    1 KB (170 words) - 12:26, 22 May 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)