Search results

Jump to navigation Jump to search
  • *NEG ZAO modules have been installed and wired by Marcy Stutzman ...o ensure there are no leaks, and that the NEG modules are not shorted out. Marcy installed an extractor gauge for vacuum monitoring after bake.
    1 KB (188 words) - 07:39, 5 October 2022
  • ...vs. energy for H2, CH4, and CO. These were weighted by gas pressures from Marcy's presentation last week.
    881 bytes (129 words) - 14:42, 24 March 2020
  • #Marcy
    345 bytes (54 words) - 09:59, 15 February 2024
  • : Marcy - Fitting update [[media:24Feb2017ExtrapolationUpdate_v2.pdf]] : Marcy - target ladder
    1 KB (177 words) - 15:17, 27 February 2017
  • #**4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?) #*Marcy dimension requests [[media:screens18gun.pptx]]
    1 KB (166 words) - 07:39, 21 April 2022
  • * (Marcy) Remake A2 joint * (Marcy) Replace harp
    1 KB (172 words) - 10:05, 9 September 2021
  • == Marcy/Phil - plans for the Y-chamber (NEG coating, NEG flange, IP, window) ==
    884 bytes (130 words) - 09:58, 10 October 2019
  • Attendees : Carlos, Mamun, Marcy, Riad, Joe * Marcy - list any UITF gun and beam line jobs or repairs to make photocathodes rel
    1,013 bytes (160 words) - 13:15, 20 July 2020
  • * Marcy's MolFlow TN - writing?
    1 KB (159 words) - 10:24, 2 August 2022
  • Marcy: Travel 17-22
    313 bytes (49 words) - 17:46, 16 September 2015
  • ; Marcy (5 min) - Vacuum beam line status (viewers, apertures, pumping) and post-ba ; Reza, Alica, Marcy, Yan, Dennis (30 min) - Beam commissioning plans: [[media:BeamINJphase1v4.p
    1 KB (180 words) - 16:06, 29 January 2021
  • #*Marcy, Joe mentioned installing this flange in the injector was a challenge: the #*Marcy, what are your conclusions on the HV chamber vacuum?
    2 KB (298 words) - 08:58, 13 April 2022
  • ; Marcy - mini-Mott recovery plan
    428 bytes (72 words) - 10:15, 7 June 2022
  • Marcy [[File:Fitting_Function_dependence.pdf]]
    508 bytes (70 words) - 12:49, 28 January 2016
  • ...grounded + flat & tilted + Gabriel will try electrostatic model with slots Marcy recommends for conductance # Marcy blow off new NEGs, install w/o ground screen, add NEG wiring, gauge, blank
    1 KB (176 words) - 23:22, 26 January 2022
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    2 KB (214 words) - 06:37, 25 August 2021
  • At today's meeting Marcy summarizes the measurements and her analysis. We'll discuss what is neede
    420 bytes (59 words) - 14:03, 30 August 2021
  • * Marcy - On-call report * AVS Symposium, Charlotte NC, October 24-29 (Marcy)
    2 KB (299 words) - 09:05, 18 August 2021
  • **Marcy - Description of vacuum - Molflow simulations and ion pumps
    453 bytes (67 words) - 20:07, 1 October 2020
  • # Update by Marcy on Degrader installation
    607 bytes (88 words) - 07:59, 4 April 2024
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    3 KB (361 words) - 08:23, 1 September 2021
  • == Friday, October 23 SWING (Tim, Marcy) == Started shift with white board tool-box meeting (Tim, Daniel, Matt, Marcy, Riad, Joe). The look up [https://logbooks.jlab.org/entry/3355838 table] o
    3 KB (468 words) - 17:20, 24 October 2015
  • #* It is awaiting vacuum degassing at 400 C for as long as possible (Marcy? Phil?) #* Marcy, could you please check with ohm-meter to make sure screen is not shorting
    3 KB (443 words) - 08:05, 22 June 2022
  • * [[8/27/21 - JLab-Euclid meeting]] - Marcy presents results of summer beam tests on diamond targets
    475 bytes (58 words) - 08:16, 27 August 2021
  • ## NEG screens: what is needed to finalize the design? Marcy, Shaun
    589 bytes (92 words) - 11:16, 28 March 2022
  • * Diamond Mott beam test #1, how do we analyze data, Riad or Marcy analysis training? Phil, rebuild 3" spool/nipple? * UITF schedule meeting just after 1:30 today...Shukui, Carlos, Max, Marcy, Phil
    2 KB (352 words) - 09:39, 4 August 2021
  • * Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region ...IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy)
    1 KB (174 words) - 10:47, 18 April 2023
  • * Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV * Marcy mini-Mott
    1 KB (222 words) - 10:36, 5 July 2022
  • * Marcy or Mamun - Jobs when venting Prep chamber
    587 bytes (88 words) - 12:59, 16 October 2020
  • **Two simulations used a constant H2 density of 10^17 and two used Marcy's H2 density profile for CEBAF from Molflow.
    1 KB (236 words) - 11:42, 3 August 2020
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    2 KB (226 words) - 09:48, 22 July 2021
  • * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, ...) ; Status on partner projects - next week when Marcy is back in town
    2 KB (237 words) - 09:57, 23 June 2021
  • * Marcy - select gold targets * Marcy - any tech note on thickness, statistics, target and beam scans?
    1 KB (216 words) - 16:18, 19 March 2021
  • * Carlos/Marcy - working mostly on UITF beam line (gun & depo)
    598 bytes (82 words) - 14:18, 25 September 2020
  • ** Marcy, Riad, Joe - Writing TN on the Mott chamber assembly [[media:MottConstructi # (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; s
    2 KB (228 words) - 09:24, 13 May 2016
  • * Marcy/Phil gun chamber vacuum work : NEG coat, when 1400's arrive, ports assigned
    662 bytes (93 words) - 21:12, 19 October 2021
  • * NEG screens - Marcy ** Marcy to meet with Shaun
    3 KB (412 words) - 11:43, 17 March 2022
  • ...the wire option for the anode and tube. We'll use 1 mm thick Cu wire that Marcy has used before, adding a strain relief. #*Weaved wire mesh that Marcy prefers: 0.88 mm wire diameter, 0.5 inch square opening is in Bubba's offic
    2 KB (381 words) - 13:05, 16 May 2022
  • 2. Marcy - Target thickness and extrapolation method [[Media:FESEM_uncertainty_effec
    797 bytes (115 words) - 17:19, 17 December 2015
  • #Marcy will work with Danny to select and finalize two kapton coated K type thermo
    692 bytes (109 words) - 17:38, 6 June 2021
  • * When Phase II vac/HV jobs ramp down - test UCSB/RIT samples @ UITF? (Phil, Marcy, Jessica, Carlos, Mamun) ...IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy)
    2 KB (234 words) - 10:47, 2 May 2023
  • 4. Time permitting: Marcy - summary of thickness uncertainties, dependence of Ao on fitting function
    714 bytes (101 words) - 21:27, 16 February 2016
  • Marcy - Target thickness
    759 bytes (109 words) - 11:42, 27 March 2015
  • Marcy: [[File:Marcy_15March2016.pdf]]
    724 bytes (101 words) - 10:56, 15 March 2016
  • Both Dan and Marcy are making great progress respectively on the analysis and target thickness
    810 bytes (114 words) - 13:30, 29 July 2015
  • :(Marcy/Tim/Riad) Status of fitting asymmetry vs. thickness and rate:corrected vers :(Joe/Marcy/Riad) Technical Description of the CEBAF Mott Polarimeter and Detector Chai
    3 KB (401 words) - 12:28, 6 February 2017
  • 1. Marcy - update on target thickness
    828 bytes (117 words) - 13:21, 12 August 2015
  • * Marcy/Bubba/Phil - path forward on vacuum chamber modification/assembly
    824 bytes (120 words) - 15:53, 16 November 2021
  • *Marcy/Carlos - sent drawings of the CEBAF photogun & anode
    622 bytes (96 words) - 17:57, 20 July 2020
  • * 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos), * Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
    2 KB (264 words) - 11:30, 13 December 2022

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)