Talk:Gun Test Stand at LERF

From Ciswikidb
Revision as of 14:11, 18 August 2015 by Chgarcia (talk | contribs) (Created page with " '''== What do we need to connect the beamline to the gunr? ==''' *Fixing the gun in its final position to the table *Install the anode *Install recently fabricated "viewer p...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

== What do we need to connect the beamline to the gunr? ==

  • Fixing the gun in its final position to the table
  • Install the anode
  • Install recently fabricated "viewer ports" anode flange
  • Install 4-1/2 inch valve between the anode flange and the beamline
  • The beamline height can be defined by the final height of the center line of the cathode, defined by gun-table assembly. We can then adjust the beamline height (80/20 adjustable feet) accordingly.
  • Can we do this before parts are ready to re-start high voltage testing? Who can do what? what help/assistance is needed?