[https://logbooks.jlab.org/entry/3521527 200keV Beam to both UITF dumps!] | [https://logbooks.jlab.org/entry/3521527 200keV Beam to both UITF dumps!] | ||
− | |||
------ | ------ | ||
− | |||
UITF Schedule - Zimbra calendar resource now functional. Add uitf-schedule to your zimbra calendar to see cae lock-up dates/times, etc. | UITF Schedule - Zimbra calendar resource now functional. Add uitf-schedule to your zimbra calendar to see cae lock-up dates/times, etc. | ||
+ | ------ | ||
+ | UPDATES | ||
− | Choppers are being conditioned by Mark and Larry. Thanks! | + | *Choppers are being conditioned by Mark and Larry. Thanks! |
− | When do you estimate to complete conditioning for 200 keV beam (75 Watts RF power on choppers). | + | *When do you estimate to complete conditioning for 200 keV beam (75 Watts RF power on choppers). |
− | Magnets: | + | *Magnets: |
+ | **Address PS rack ITF03 which prevents using four magnets presently | ||
+ | **Need to add one more corrector pair between the gun and the solenoid | ||
+ | **EPICS magnet screen is complete and functional with field maps provided by Joe | ||
− | Valves | + | *Valves |
− | When will the two MDC valves have status read back? | + | **When will the two MDC valves have status read back? |
− | FSD | + | *FSD |
− | Performed software functionality test in UITF control room last week. What else is needed for full functionality? | + | **Performed software functionality test in UITF control room last week. What else is needed for full functionality? |
− | BPMs | + | *BPMs |
− | Cables installed and terminated. | + | **Cables installed and terminated. |
− | Status on hardware, firmware, and EPICS software? | + | **Status on hardware, firmware, and EPICS software? |
− | CRYO | + | *CRYO |
− | From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K. Any updates? | + | **From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K. Any updates? |
− | Estimate time to complete? | + | **Estimate time to complete? |
− | RF | + | *RF |
− | Update on RF for Quarter Cryo Module? | + | **Update on RF for Quarter Cryo Module? |
− | Estimate time to complete? | + | **Estimate time to complete? |
Revision as of 08:47, 29 January 2018
200keV Beam to both UITF dumps!
UITF Schedule - Zimbra calendar resource now functional. Add uitf-schedule to your zimbra calendar to see cae lock-up dates/times, etc.
UPDATES
- Choppers are being conditioned by Mark and Larry. Thanks!
- When do you estimate to complete conditioning for 200 keV beam (75 Watts RF power on choppers).
- Magnets:
- Address PS rack ITF03 which prevents using four magnets presently
- Need to add one more corrector pair between the gun and the solenoid
- EPICS magnet screen is complete and functional with field maps provided by Joe
- Valves
- When will the two MDC valves have status read back?
- FSD
- Performed software functionality test in UITF control room last week. What else is needed for full functionality?
- BPMs
- Cables installed and terminated.
- Status on hardware, firmware, and EPICS software?
- CRYO
- From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K. Any updates?
- Estimate time to complete?
- RF
- Update on RF for Quarter Cryo Module?
- Estimate time to complete?
Epics screens
Working with T. Larrieu and team on SAVE/RESTORE.
Matt is working on OSP for buncher and choppers
By February 5, 2018:
All cryo work complete All High Power RF work complete OSP for QCM approved ODH assessment, vent can on relief stack, penetrations filled, etc,