# Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company)
 
# Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company)
# Vacuum Group, build the MeV beamline
+
# Suggest we as the Vacuum Group to build the MeV beamline (my group can help)
# Cryo: install the helium return line
+
# Cryo: install the helium return line, or be content to vent the helium to the test lab
# SRF, need a point of contact for all things related to QCM operation
+
# SRF, need a point of contact for all things related to QCM operation, it's still confusing to me who to talk to
# Electrical engineering: design and build the PSS BCM
+
# Electrical engineering: design and build the PSS BCM, our "credited control" to limit beam current/loss and prevent accidental exposure to xrays
 
# Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today)
 
# Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today)
 
# Magnet group: give us a third trim card rack
 
# Magnet group: give us a third trim card rack
 
# RF group: klystrons, high power amplifier, solid state amp, water skids
 
# RF group: klystrons, high power amplifier, solid state amp, water skids
 
# Vashek: finish specifying the shielding requirements, then we start moving lead
 
# Vashek: finish specifying the shielding requirements, then we start moving lead
# R&D related to low current BPMs, suggest you take that on, with help from Engineering
+
# R&D related to low current BPMs, suggest Andy take this on, with help from Engineering
 
# Operations Group should augment Joe's modeling, using a particle tracking code
 
# Operations Group should augment Joe's modeling, using a particle tracking code
# Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review
+
# Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review, lots of documents, lots of reviews
 
# Gun group needs to build a new photogun
 
# Gun group needs to build a new photogun
 
# Need to operate the UITF on a daily basis.....
 
# Need to operate the UITF on a daily basis.....
 +
# Need access to liquid helium for weeks long periods of time (i.e., competition with LCLS)

Revision as of 12:41, 13 June 2018


Tasks before running beam to HDIce for target commissioning



  1. Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company)
  2. Suggest we as the Vacuum Group to build the MeV beamline (my group can help)
  3. Cryo: install the helium return line, or be content to vent the helium to the test lab
  4. SRF, need a point of contact for all things related to QCM operation, it's still confusing to me who to talk to
  5. Electrical engineering: design and build the PSS BCM, our "credited control" to limit beam current/loss and prevent accidental exposure to xrays
  6. Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today)
  7. Magnet group: give us a third trim card rack
  8. RF group: klystrons, high power amplifier, solid state amp, water skids
  9. Vashek: finish specifying the shielding requirements, then we start moving lead
  10. R&D related to low current BPMs, suggest Andy take this on, with help from Engineering
  11. Operations Group should augment Joe's modeling, using a particle tracking code
  12. Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review, lots of documents, lots of reviews
  13. Gun group needs to build a new photogun
  14. Need to operate the UITF on a daily basis.....
  15. Need access to liquid helium for weeks long periods of time (i.e., competition with LCLS)