Difference between revisions of "UITF Meeting - June 15, 2018"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
# Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company) | # Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company) | ||
− | + | # Suggest we use the Vacuum Group to build the MeV beamline (my group can help) | |
− | # Vacuum Group | + | # Cryo: install the helium return line, or be content to vent the helium to the test lab |
− | + | # SRF, need a point of contact for all things related to QCM operation, it's still confusing to me who to talk to | |
− | # Cryo: install the helium return line | + | # Electrical engineering: design and build the PSS BCM, our "credited control" to limit beam current/loss and prevent accidental exposure to xrays |
− | |||
− | # SRF, need a point of contact for all things related to QCM operation | ||
− | |||
− | # Electrical engineering: design and build the PSS BCM | ||
− | |||
# Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today) | # Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today) | ||
− | |||
# Magnet group: give us a third trim card rack | # Magnet group: give us a third trim card rack | ||
− | |||
# RF group: klystrons, high power amplifier, solid state amp, water skids | # RF group: klystrons, high power amplifier, solid state amp, water skids | ||
− | + | # SSG to incorporate high power RF interlocks into PSS, recertify | |
# Vashek: finish specifying the shielding requirements, then we start moving lead | # Vashek: finish specifying the shielding requirements, then we start moving lead | ||
− | + | # RCG to install all CARMs and electronics | |
− | # R&D related to low current BPMs, suggest | + | # R&D related to low current BPMs, suggest Andy take this on, with help from Engineering |
− | |||
# Operations Group should augment Joe's modeling, using a particle tracking code | # Operations Group should augment Joe's modeling, using a particle tracking code | ||
− | + | # Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review, lots of documents, lots of reviews | |
− | # Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review | ||
− | |||
# Gun group needs to build a new photogun | # Gun group needs to build a new photogun | ||
− | |||
# Need to operate the UITF on a daily basis..... | # Need to operate the UITF on a daily basis..... | ||
+ | # Need access to liquid helium for weeks long periods of time (i.e., competition with LCLS) |
Latest revision as of 09:52, 22 June 2018
Tasks before running beam to HDIce for target commissioning
- Mechanical design, full time for next ~ 4 months, then intermittently (i.e., Shaun Gregory and company)
- Suggest we use the Vacuum Group to build the MeV beamline (my group can help)
- Cryo: install the helium return line, or be content to vent the helium to the test lab
- SRF, need a point of contact for all things related to QCM operation, it's still confusing to me who to talk to
- Electrical engineering: design and build the PSS BCM, our "credited control" to limit beam current/loss and prevent accidental exposure to xrays
- Electrical engineering: stripline BPMs, get them to work (not the pA BPMs were were talking about today)
- Magnet group: give us a third trim card rack
- RF group: klystrons, high power amplifier, solid state amp, water skids
- SSG to incorporate high power RF interlocks into PSS, recertify
- Vashek: finish specifying the shielding requirements, then we start moving lead
- RCG to install all CARMs and electronics
- R&D related to low current BPMs, suggest Andy take this on, with help from Engineering
- Operations Group should augment Joe's modeling, using a particle tracking code
- Safety: OSP for buncher, OSP for MeV beam, PSS BCM credited control documentation, UITF Accelerator Operations Directive, Conduct of Operations, Accelerator Readiness review, lots of documents, lots of reviews
- Gun group needs to build a new photogun
- Need to operate the UITF on a daily basis.....
- Need access to liquid helium for weeks long periods of time (i.e., competition with LCLS)