Difference between revisions of "Wednesday August 6, 2014"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Ph...")
 
Line 11: Line 11:
  
 
1- Bubble Chamber progress at Argonne
 
1- Bubble Chamber progress at Argonne
 +
 +
2. (Grames) JLab Update
 +
 +
; Design, installation and released mechanical drawings are here \group\bubble\grames
 +
* Beamline Assembly [[media:ACC2008000-1100.pdf]]
 +
 +
; Fabrication status
 +
* [[media:140806_FabricationStatus.pdf]]
 +
 +
; Installation status
 +
* Injector power restored 2 days ago, can resume work
 +
* Phil coordinating installation of S&A + Installation group for new points & pedestals
 +
* Vacuum parts assembly will begin soon, tunnel installation date TBD
 +
* Instrumentation hook-ups and cable pulls by ~Labor Day
 +
 +
; Commissioning status
 +
* Provided punch list to Director of Ops (vacation until mid-August)
 +
* High level goals are beam line functionality & 100uA at highest energy on radiator
 +
* Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization

Revision as of 10:51, 6 August 2014

We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne

2. (Grames) JLab Update

Design, installation and released mechanical drawings are here \group\bubble\grames
Fabrication status
Installation status
  • Injector power restored 2 days ago, can resume work
  • Phil coordinating installation of S&A + Installation group for new points & pedestals
  • Vacuum parts assembly will begin soon, tunnel installation date TBD
  • Instrumentation hook-ups and cable pulls by ~Labor Day
Commissioning status
  • Provided punch list to Director of Ops (vacation until mid-August)
  • High level goals are beam line functionality & 100uA at highest energy on radiator
  • Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization