Difference between revisions of "Wednesday August 6, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
  
 
; Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames
 
; Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames
* Beamline Assembly [[media:ACC2008000-1100.pdf]]
+
* Songsheet and nomenclature [[media:ACC2008000-1100.pdf]]
  
 
; Fabrication status
 
; Fabrication status
Line 22: Line 22:
 
; Installation status
 
; Installation status
 
* Injector power restored 2 days ago, can resume work
 
* Injector power restored 2 days ago, can resume work
* Phil coordinating installation of S&A + Installation group for new points & pedestals
+
* Phil coordinating Alignment + Installation groups for new points & pedestals (in hand)
 
* Vacuum parts assembly will begin soon, tunnel installation date TBD
 
* Vacuum parts assembly will begin soon, tunnel installation date TBD
 
* Instrumentation hook-ups and cable pulls by ~Labor Day
 
* Instrumentation hook-ups and cable pulls by ~Labor Day

Revision as of 10:54, 6 August 2014

We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne

2. (Grames) JLab Update

Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames
Fabrication status
Installation status
  • Injector power restored 2 days ago, can resume work
  • Phil coordinating Alignment + Installation groups for new points & pedestals (in hand)
  • Vacuum parts assembly will begin soon, tunnel installation date TBD
  • Instrumentation hook-ups and cable pulls by ~Labor Day
Commissioning status
  • Provided punch list to Director of Ops (vacation until mid-August)
  • High level goals are beam line functionality & 100uA at highest energy on radiator
  • Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization