Difference between revisions of "Wednesday December 11, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
 
   - New fast valve and its electronics [[media:275218EC_Manual.pdf]] [[media:752_1VFE.pdf]]. Total closing time <10 ms.
 
   - New fast valve and its electronics [[media:275218EC_Manual.pdf]] [[media:752_1VFE.pdf]]. Total closing time <10 ms.
  
3- Latest drawing of Bubble Chamber beamline: [[media:Bubble_Chamber_Beamline_Drawing.pdf]] (units of the drawing are inches) and side-view elevation: [[File:Beamline_sideview.jpg|none|800px|alt= Beamline side-view]]
+
3- Latest drawing of Bubble Chamber beamline: [[media:Bubble_Chamber_BeamLine_Drawing_top.pdf]] [[media:Bubble_Chamber_BeamLine_Drawing_side.pdf]] (units of the drawing are inches) and side-view elevation: [[File:Beamline_elev.jpg|none|800px|alt= Beamline side-view]]
  
 
4- Bubble Chamber progress at Argonne
 
4- Bubble Chamber progress at Argonne
  
 
5- Draft of the Accelerator Seminar talk (on Thursday January 9, 2014): [[media:Acc_Seminar.pdf]] [[media:Acc_Seminar.pptx]]
 
5- Draft of the Accelerator Seminar talk (on Thursday January 9, 2014): [[media:Acc_Seminar.pdf]] [[media:Acc_Seminar.pptx]]

Revision as of 10:37, 10 December 2013

We will meet in TED 2561B on Wednesday December 11 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- New "5 MeV" Dipole update media:new_5Mev_dipole_Nov20.pdf

2- The accelerator will fund (as part of Injector improvement):

 - New dipole magnet and a Hall probe system: GMW DTM-151 [1].  The Group3 DTM-151 is the highest performance Hall effect
teslameter commercially available with digital linearity and temperature correction to provide 0.01% accuracy, resolution to 2ppm,
and a temperature stability of 10ppm/°C.
 - New fast valve and its electronics media:275218EC_Manual.pdf media:752_1VFE.pdf. Total closing time <10 ms.

3- Latest drawing of Bubble Chamber beamline: media:Bubble_Chamber_BeamLine_Drawing_top.pdf media:Bubble_Chamber_BeamLine_Drawing_side.pdf (units of the drawing are inches) and side-view elevation:

Beamline side-view

4- Bubble Chamber progress at Argonne

5- Draft of the Accelerator Seminar talk (on Thursday January 9, 2014): media:Acc_Seminar.pdf media:Acc_Seminar.pptx