Difference between revisions of "Wednesday March 5, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
  
  
 +
----
 +
 +
'''Notes from this meeting:'''
  
 
  * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
 
  * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
 
  Chamber beamline, in the radiator chamber.
 
  Chamber beamline, in the radiator chamber.

Revision as of 17:37, 5 March 2014

We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Bubble Chamber Schedule at JLab

3- How would the 5D beamline look for the Bubble Chamber test in October 2014?



Notes from this meeting:

* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble
Chamber beamline, in the radiator chamber.