Difference between revisions of "Template:ShortTermSchedule-RGK"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
'''<span style="font-size:120%; line-height: 1.3em;">Experiment Coordinator: Annalisa D'Angelo''' </span> | '''<span style="font-size:120%; line-height: 1.3em;">Experiment Coordinator: Annalisa D'Angelo''' </span> | ||
− | '''<span style="font-size:120%; line-height: 1.3em;">Run Coordinator: | + | '''<span style="font-size:120%; line-height: 1.3em;">Run Coordinator: Susan Schadmand''' (757) 575-7540</span> |
'''<span style="font-size:120%; line-height: 1.3em;">PDL: Daniel Carman''' (757) 876-1789; Office: x5586</span> | '''<span style="font-size:120%; line-height: 1.3em;">PDL: Daniel Carman''' (757) 876-1789; Office: x5586</span> | ||
Line 10: | Line 10: | ||
:::::::::::::::<span style="font-size:122%; line-height: 2em;"><p class="animate flash"><font color=red>''' Do NOT change FSD settings without approval from RC or beamline expert!'''</font></p></span> | :::::::::::::::<span style="font-size:122%; line-height: 2em;"><p class="animate flash"><font color=red>''' Do NOT change FSD settings without approval from RC or beamline expert!'''</font></p></span> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* '''In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House''' and inform the Crew Chief and RC. | * '''In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House''' and inform the Crew Chief and RC. | ||
Line 102: | Line 91: | ||
== <font color=Navy> '''DAQ Operation & Related General Information''' </font> == | == <font color=Navy> '''DAQ Operation & Related General Information''' </font> == | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | * '''STANDARD''' end and start of the run: | + | * <font color=red>'''NEW STANDARD''' end and start of the run:</font> |
:- "End run" | :- "End run" | ||
:- "Cancel" | :- "Cancel" | ||
Line 109: | Line 98: | ||
:- "Prestart" | :- "Prestart" | ||
:- "Go" | :- "Go" | ||
+ | This will ensure proper compression of the FADCs and therefore a smaller data rate. | ||
* '''Restart DAQ''' when changing configuration or trigger files, when the run did not end correctly, when ROCs are rebooted, or after RICH Fast/Full recovery: | * '''Restart DAQ''' when changing configuration or trigger files, when the run did not end correctly, when ROCs are rebooted, or after RICH Fast/Full recovery: | ||
Line 164: | Line 154: | ||
|+ Latest settings. If these don't match the white board, call the RC. | |+ Latest settings. If these don't match the white board, call the RC. | ||
|- | |- | ||
− | ! BPM !! Coordinate !! | + | ! BPM !! Coordinate !! Reading (mm) |
|- | |- | ||
| 2C24A || x || -1.7 | | 2C24A || x || -1.7 |
Revision as of 14:34, 17 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- Arrive at least 10 minutes early for shift change;
- Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- Important links
- Recent Changes and Current Issues
- General How-to for beam restoration procedures and Møller runs.
Run Plan, Tuesday, Jan. 16 - Wednesday, Jan. 17, 2024
Taking Production Data
|
General Information
|
DAQ Operation & Related General Information
This will ensure proper compression of the FADCs and therefore a smaller data rate.
|
|
Glossary of Triggers
Our current default production trigger is rgk_noDC_v1.1_300MeV.trg.
Trigger | Explanation |
---|---|
rgk_noDC_v1.0_300MeV.trg | DC roads are not in the trigger. Hold off time is 3 us. |
rgk_noDC_v1.1_300MeV.trg | DC roads are not in the trigger. Hold off time is 2 us. |
rgk_noDC_v1.2_300MeV.trg | DC roads are not in the trigger. Hold off time is 1 us. |
rgk_out_v1.1_300MeV.trg | Outbending DC roads, Hold off time is 2 us. |
Reference Values
BPM Settings
|
FSD Thresholds from RG-K
|
Harp Scan References from RG-K
- Tagger (2C24A)
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238887
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238638 x= -2.0 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238622
- 2H01
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238889
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238673 x= -1.1 mm; y= 0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4234764
- 2C21A
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238636 x= -0.4 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238636
To Do Items
- Faraday Cup Calibration
- Rafo can use beam current scan taken from Sat. Jan. 13, during 13:50 - 14:20
- Empty target running (with full field)
- Goal is to take > 5% integrated charge, but not until about 2 weeks in
- Prescale on FC cup trigger
- Discuss when to study after we have a plan for Tuesday Jan. 16 down time