Difference between revisions of "Run Meeting: March 20th, 2020"
Jump to navigation
Jump to search
(Created page with "Back to Run Group F | Daily Run Group F Coordination Meetings 10:00AM Run Meeting, Counting house meeting room (200C) '''RC:''' Carlos Ayerbe ==Summary...") |
|||
Line 7: | Line 7: | ||
==Summary of past 24h:== | ==Summary of past 24h:== | ||
− | * | + | * Summary in the RC Daily Report |
− | |||
− | |||
+ | https://logbooks.jlab.org/entry/3806359 | ||
+ | * HV issues (https://logbooks.jlab.org/entry/3806487): | ||
+ | ** in order to run cosmic, we tweak the HV GUI to short the delay time to ramp up the GEM voltage and reduce the cathode to -5500V | ||
+ | ** we were able to run op to -5600 (I guess Mohammad raised to -5650 and later in the night to -6100V but not sure when) | ||
+ | ** From the strip chart it is clear the RTPC trips around 04:30 [[File:Clonpc14 20200320 085446.gif]] | ||
==Plan:== | ==Plan:== |
Revision as of 08:11, 20 March 2020
Back to Run Group F | Daily Run Group F Coordination Meetings
10:00AM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
- Summary in the RC Daily Report
https://logbooks.jlab.org/entry/3806359
- HV issues (https://logbooks.jlab.org/entry/3806487):
- in order to run cosmic, we tweak the HV GUI to short the delay time to ramp up the GEM voltage and reduce the cathode to -5500V
- we were able to run op to -5600 (I guess Mohammad raised to -5650 and later in the night to -6100V but not sure when)
- From the strip chart it is clear the RTPC trips around 04:30
Plan:
Slides
Info
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/7576835804