− | <center>Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: [https://jlab-org.zoomgov.com/j/1605705819 URL Link] ('''''Meeting ID''''': 1605705819'')''', ''except on '''Wednesdays''', which is ''' @ 15:00 in CH Room 200C and | + | <center>Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: [https://jlab-org.zoomgov.com/j/1605705819 URL Link] ('''''Meeting ID''''': 1605705819'')''', ''except on '''Wednesdays''', which is ''' @ 15:00 in CH Room 200C and at the same ZOOM link. </center> |
== Important Notes == | == Important Notes == |
Revision as of 16:09, 11 April 2024
Run Coordinator: William Brooks (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pull down menu to choose where an error is reported.
Tomorrow (Thursday) accel crews will be setting the beam for Hall A we will go to controlled access, and bring magnets down (The Torus ramp down will take about 1 hour.) for cryo tuning and walkthroughs. Short term schedule [1]
=== Preparation for Beam after recovery (Wednesday April 10)=====New Wien angle and therefore expecting a new tune. Therefore when the beam is back, start with beam tuning in the tagger dump:see Establishing beam[2] ==== Eugene suggests we should be ready===We can prepare all this now: turn all detectors off and request to energize the tagger magnet.
If the beam is not acceptable Eugene asked to be called to help establishing good beam.
Production data taking
In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. LD2+C runs
For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 Long term run plan [4] |
ReferencesBPM Positions
Harp ScansFSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!