Run Meeting: March 23rd, 2020
Jump to navigation
Jump to search
Back to Run Group F | Daily Run Group F Coordination Meetings
10:00AM Run Meeting, Counting house meeting room (200C) (NOT)
RC: Carlos Ayerbe
Summary of past 24h:
- Summary in the RC Daily Report
Plan:
Shutdown Procedures:
All these should be discussed with Bob M. and Denny I.
- Keep the RTPC inside the Solenoid.
- Turn Off all elements related to the RTPC.
- Jiwan must consult Irakli about the FEUs.
- Friendly reminder to the experts of all systems how to proceed.
- Fill the target with N2 and keep it running at very low rate.
Info
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/7576835804