Difference between revisions of "General How-to"

From clas12-run
Jump to navigation Jump to search
 
(18 intermediate revisions by 3 users not shown)
Line 8: Line 8:
 
=== Restoring Beam after Short Downtime ===
 
=== Restoring Beam after Short Downtime ===
  
* Ask for 5 nA beam current and check the 2C24A and 2H01 beam (x, y) positions against the Reference Values (at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab) whenever  
+
* Ask for 5 nA beam current and check the 2C24A and 2H01 beam (x, y) positions against the Reference Values (run wiki tab "Short Term Schedule") after  
:• there is a beam steering or a change in its orbits;
+
** beam steering or orbit change
:• the beam current is changed; e.g., after a target change;
+
** change in beam current, e.g., after a target change
:• BPMs 2C21A and 2H01 positions are off, i.e., they are not within +/-0.1 mm. If so, ask MCC to bring them to the reference values recorded at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab.
+
** If BPM 2C24A and 2H01 positions are off, (not within +/-0.1 mm), ask MCC to bring them to the reference values, (run wiki tab "Short Term Schedule")
 +
** The beam position at 2C21A is not important for production
  
 
=== Beam Tuning to Tagger Dump ===
 
=== Beam Tuning to Tagger Dump ===
Line 19: Line 20:
  
 
* A few points to note:  
 
* A few points to note:  
:• Change the beam type to "Photon" from the "BTA Config";
+
:• Change the beam type to "Photon" from the "BTA Config"
:• Ask MCC to energize the tagger magnet;
+
:• Ask MCC to energize the tagger magnet
:• Move the collimator to the Blank position after the tagger is energized to avoid getting an alarm;
+
:• Move the collimator to the Blank position after the tagger is energized  
:• Ask MCC to mask the beam halo counters (FSDs: Upstream, Midstream, Downstream, BOM);
+
:• Ask MCC to mask the beam halo counters (FSDs: Upstream, Midstream, Downstream, BOM)  
 
:• Ask MCC for 5 nA beam current and make sure the Orbit Locks are OFF;
 
:• Ask MCC for 5 nA beam current and make sure the Orbit Locks are OFF;
:• Check the 2C21A and 2C24A beam positions (x, y) against the Reference Values (at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab);
+
:• Check the 2C21A and 2C24A beam positions (x, y) against the Reference Values (run wiki tab "Short Term Schedule")
 
::- If the beam positions are OFF, ask MCC to bring them to the reference values.
 
::- If the beam positions are OFF, ask MCC to bring them to the reference values.
 
:• In case the two BPMs (x, y) positions look good, take a harp scan (HS) at Harp 2C21 (Upstream Right Counter) and Tagger Harp (2C24; Upstream Right Counter):   
 
:• In case the two BPMs (x, y) positions look good, take a harp scan (HS) at Harp 2C21 (Upstream Right Counter) and Tagger Harp (2C24; Upstream Right Counter):   
 
::- It should be noted that the beam must be ON during the scan. Once OFF, abort and restart once the beam is back.  
 
::- It should be noted that the beam must be ON during the scan. Once OFF, abort and restart once the beam is back.  
::- Compare the results with the HS References at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab and bear in mind that the fit ranges might need to be adjusted manually to assess the fit results;
+
::- Compare the results with the HS References (run wiki tab "Short Term Schedule") and bear in mind that the fit ranges might need to be adjusted manually to assess the fit results;
 
::- If good, log the new scan results.
 
::- If good, log the new scan results.
  
 
=== Møller run ===
 
=== Møller run ===
  
* Check the manual: [https://wiki.jlab.org/clas12-run/images/e/e4/Clas12moller.pdf Performing Møller Runs]:
+
Follow the standard procedure as described in the manual [https://wiki.jlab.org/clas12-run/images/e/e4/Clas12moller.pdf Performing Møller Runs].
:• Must be noted that the manual has not been updated since the last run period. However, the underlying script in the '''Møller Run GUI''' should do it all for you.
+
 
:• '''Request No Beam:''' ask MCC to take beam away for a configuration change;
+
A few points to note:
:• '''Reconfigure''' and '''Enter''';
+
* '''Request 20 nA''' , Orbit Locks should be OFF;
:• '''Request 5 nA''' and make sure the Orbit Locks are still OFF;
+
* The BPMs 2C21 and 2C24A may be out of range after the Møller configuration.
::- The BPMs 2C21 and 2C24A may be out of range after the Møller configuration. That is fine, so don't ask MCC to adjust it to the reference values, as that will mess up the positions after exiting the Møller configuration.
+
* Keep running until the polarization uncertainty is < 1.5%
:&bull; '''Start Run''' and keep it running until the polarization uncertainty reaches 1.5% or 2%, depending on the beam stability and trip frequency;
 
:&bull; '''End Run''' and log its results after entering your username;
 
:&bull; '''Request No Beam:''' ask MCC to take the beam away for a configuration change;
 
:&bull; '''Exit''' the Moller configuration.
 
  
 
=== Beam Tuning to Faraday Cup ===
 
=== Beam Tuning to Faraday Cup ===
  
* Study the manual: [https://raw.githubusercontent.com/JeffersonLab/clas12-manuals/master/beamline/manual/beam_estab_rgd.pdf Establishing Physics-Quality Beam], and take into account the first steps mentioned therein. This is typically done after tuning to the tagger dump (and possibly taking a Moller run).  
+
Study the manual: [https://raw.githubusercontent.com/JeffersonLab/clas12-manuals/master/beamline/manual/beam_estab_rgd.pdf Establishing Physics-Quality Beam], and take into account the first steps mentioned therein. This is typically done after tuning to the tagger dump (and possibly taking a Moller run).  
  
 
* A few points to note:  
 
* A few points to note:  
:&bull; Change the beam type to "Electron";
+
** Change the beam type to "Electron";
:&bull; Ask MCC to de-energize the tagger magnet, which includes degaussing the tagger magnet and turning the power supply OFF;
+
** Ask MCC to de-energize the tagger magnet, which includes degaussing the tagger magnet and turning the power supply OFF;
::- ''Ask the operator to use the script only, not try it by hand, as this might trip the circuit breaker of the tagger magnet power supply.''
+
** ''Ask the operator to use the script only, not try it by hand, as this might trip the circuit breaker of the tagger magnet power supply.''
:&bull; Make sure the target is set to "Empty" from the drop menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual].
+
** (If initial beam tune, target should be "Empty")
:&bull; Make sure the Beam Blocker is retracted from the beamline.
+
** Make sure the Beam Blocker is OUT
:&bull; Move the collimator to the 20 mm position;
+
** Move the collimator to the 20 mm position
:&bull; Ask MCC to unmask beam halos;
+
** Ask MCC to unmask beam halos
:&bull; Set the halo counter FSD thresholds to 1 MHz and the integration time interval to 50 milliseconds;
+
** Set the halo counter FSD thresholds to 1 MHz and the integration time interval to 50 milliseconds
:&bull; Insert the Downstream Viewer, Chromax, in the beamline;
+
** Insert the Downstream Viewer, Chromax, in the beamline
:&bull; Ask MCC for 5 nA beam current;
+
** Ask MCC for 5 nA beam current
:&bull; Check the 2C24A and 2H01 beam positions (x, y) against the Reference Values (at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab);
+
*** If the 2C24A and 2H01 beam positions are OFF, ask MCC to bring them to the reference values (see run wiki tab Short_Term_Schedule)
::- If the beam positions are OFF, ask MCC to bring them to the reference values;
+
*** In case the BPM (x, y) positions look good, take a harp scan at 2H01 (Midstream Left)
:&bull; In case the two BPMs (x, y) positions look good, take a harp scan at 2H01 (Midstream Left);
+
*** The beam must be ON during the scan. Once OFF, abort and restart once the beam is back
::- It should be noted that the beam must be ON during the scan. Once OFF, abort and restart once the beam is back.
+
*** Compare the results with the harp scan references (see tab Short_Term_Schedule)
::- Compare the results with the HS References at the bottom of [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab;
+
*** If good, log the new scan results.
::- If good, log the new scan results.
 
  
 
* Once done and before resuming the production data-taking:
 
* Once done and before resuming the production data-taking:
:&bull; Retract the Downstream Viewer from the beamline;
+
** Retract the Downstream Viewer from the beamline;
:&bull; Put the FSDs thresholds and integration time to their reference values;
+
** Put the FSDs thresholds and integration time to their reference values;
:&bull; Turn all detectors HV ON and make sure the MVT is switched to "HV ON - Full Voltage";
+
** Turn all detector HV ON, for MVT "HV ON - Full Voltage";
:&bull; Proceed with production as instructed in [https://wiki.jlab.org/clas12-run/index.php/Run_Group_D#tab=Short_Term_Schedule Short Term Schedule] tab:
+
** MCC might need to adjust the beam positions after going to the production beam current.
::- Keep in mind that MCC might need to adjust the beam positions after going to the production beam current.
 

Latest revision as of 12:29, 19 January 2024


Beam Restoration

Restoring Beam after Short Downtime

  • Ask for 5 nA beam current and check the 2C24A and 2H01 beam (x, y) positions against the Reference Values (run wiki tab "Short Term Schedule") after
    • beam steering or orbit change
    • change in beam current, e.g., after a target change
    • If BPM 2C24A and 2H01 positions are off, (not within +/-0.1 mm), ask MCC to bring them to the reference values, (run wiki tab "Short Term Schedule")
    • The beam position at 2C21A is not important for production

Beam Tuning to Tagger Dump

◊ Make sure the BMT along FMT is in SAFE mode, SVT HV is OFF, (LV is ALWAYS ON), and all other CLAS12 detectors HV are OFF.
  • A few points to note:
• Change the beam type to "Photon" from the "BTA Config"
• Ask MCC to energize the tagger magnet
• Move the collimator to the Blank position after the tagger is energized
• Ask MCC to mask the beam halo counters (FSDs: Upstream, Midstream, Downstream, BOM)
• Ask MCC for 5 nA beam current and make sure the Orbit Locks are OFF;
• Check the 2C21A and 2C24A beam positions (x, y) against the Reference Values (run wiki tab "Short Term Schedule")
- If the beam positions are OFF, ask MCC to bring them to the reference values.
• In case the two BPMs (x, y) positions look good, take a harp scan (HS) at Harp 2C21 (Upstream Right Counter) and Tagger Harp (2C24; Upstream Right Counter):
- It should be noted that the beam must be ON during the scan. Once OFF, abort and restart once the beam is back.
- Compare the results with the HS References (run wiki tab "Short Term Schedule") and bear in mind that the fit ranges might need to be adjusted manually to assess the fit results;
- If good, log the new scan results.

Møller run

Follow the standard procedure as described in the manual Performing Møller Runs.

A few points to note:

  • Request 20 nA , Orbit Locks should be OFF;
  • The BPMs 2C21 and 2C24A may be out of range after the Møller configuration.
  • Keep running until the polarization uncertainty is < 1.5%

Beam Tuning to Faraday Cup

Study the manual: Establishing Physics-Quality Beam, and take into account the first steps mentioned therein. This is typically done after tuning to the tagger dump (and possibly taking a Moller run).

  • A few points to note:
    • Change the beam type to "Electron";
    • Ask MCC to de-energize the tagger magnet, which includes degaussing the tagger magnet and turning the power supply OFF;
    • Ask the operator to use the script only, not try it by hand, as this might trip the circuit breaker of the tagger magnet power supply.
    • (If initial beam tune, target should be "Empty")
    • Make sure the Beam Blocker is OUT
    • Move the collimator to the 20 mm position
    • Ask MCC to unmask beam halos
    • Set the halo counter FSD thresholds to 1 MHz and the integration time interval to 50 milliseconds
    • Insert the Downstream Viewer, Chromax, in the beamline
    • Ask MCC for 5 nA beam current
      • If the 2C24A and 2H01 beam positions are OFF, ask MCC to bring them to the reference values (see run wiki tab Short_Term_Schedule)
      • In case the BPM (x, y) positions look good, take a harp scan at 2H01 (Midstream Left)
      • The beam must be ON during the scan. Once OFF, abort and restart once the beam is back
      • Compare the results with the harp scan references (see tab Short_Term_Schedule)
      • If good, log the new scan results.
  • Once done and before resuming the production data-taking:
    • Retract the Downstream Viewer from the beamline;
    • Put the FSDs thresholds and integration time to their reference values;
    • Turn all detector HV ON, for MVT "HV ON - Full Voltage";
    • MCC might need to adjust the beam positions after going to the production beam current.