01/19/2017 Meeting
Attendance
Thompson, Creel, Dixon, Michalski, Oren
Agenda and Notes
1. Operations
LINAC
LINAC's at 2K
Some controls issues were reported with new IOC restore routines for RF. Routine was intermittently restoring heat values to manual with zero heat.
CHL1
Normal.
No updates from AL/S2M.
CHL2
Normal
ESR
Normal.
Transferline valve is not functioning. The guys have a plan to change the CAMAC card this morning.
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.
CTF
Normal
Kinney #2 ring pump spun a bearing. The ring pump has been moved to the repair facility in Chesapeake. There is no spare Kinney at CTF until it returns.
The LCLS2 cryomodule is under test.
HDR
Normal.
2. Projects
UIM
We will move ahead with the CB3 installation and the remainder of the controls upgrade starting Feb 17.
UITF
Pressure tests completed on transferline. The HDIce return line and electrical and controls work remain. Vacuum leaks in the transferline shell were located and sealed.
MSU
Working to accumulate the pressure systems documentation.
LCLS2
?
3. Manpower
New engineer arriving early Feb. He will work 50% of his time on EI&C for LCLS2 and remainder on OPS.
4. Info from Will
1. Watch spending on OPS and ENG accounts. Try to keep spending to critical "stop work" items.
2. We will likely be on continuing resolution for the full FY all the way until FY18
3. LN2 contract proposals are in.
5. Other
Action Items
1. Must keep meeting to no more than 30 minutes
2. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.
Action Item Updates
1.