1. Operations LINAC

Problems with magnet power supply will continue for a few more weeks due to vendor parts issues. A secondary plan is underway to purchase and run 1000 feet of 535MCM cable to operate one magnet off a different power supply.


CHL1

Two trips. First was related to a primary circuit breaker trip on LS4. Second was a loose pin on the T2 turbine controller.

CHL2

Normal


ESR

Sending 15K 20g/s to Hall A target 4K load is at 1410W out of 1500W available from ESR alone.

Current Loads within approximately 50W Hall A 6 magnets and one target Hall B torus (they have ramped to 300A and did a fast dump which blew the primary 4.5K relief) Hall C Old HMS, HB, Q1


CTF

CMTF has completed testing the new quarter for M. Poelker. Utubes have been removed. VTA/CMTF is not using much capacity.


HDR

Turbine water filters are requiring more frequent changing since tropical storm Mathew.


2. Projects UITF

We can start performing work that is labor only.


MSU

Upper cold box will be delivered to MSU soon. Fabio wants us to change the model for the compressors from Ideas to Solidworks.


LCLS2

Results of installation review were complicated. Reviewers wanted to see much more detail than they provided and have made several recommendations such as hiring an outside reviewer to check all calculations, verify piping sizes, etc.


3. Manpower

The new EE is scheduled to start on Nov 1.


4. Info from Will 1. Appraisals and new expectations 2. D&I training 3. Watch all spending on OPS and ENG accounts

Action Items

1. Must keep meeting to no more than 30 minutes


Action Item Updates

1. Failed again. Meeting was 1 hour long.