11/14/2017 Meeting

From Cryowiki
Jump to navigationJump to search

Attendance

Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,


Goals

The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.


Agenda and Notes

1. Safety


2. Schedule

Plan is to run CHL1 and CHL2 at 2K until mid March.


3. JLAB Internal Group Projects

GPP (Yang, Thilan)

Kinney Pump Relocation


Main Gas and Recovery Gas Management Systems


CTF C3 Interstage Heat Exchanger Removal



Install redundant 12V power supplies for cryo cons


CHL to FEL Utubes (Perry, Corey)


CHL1 Regeneration Skid Removal (Schleeper, Thompson)

-Helium line can be isolated and blanked at anytime with LOTO. -Water lines isolated. -Vacuum line can be isolated when CHL1 cold box is off line and warm.


Change SC1 and SC2 batteries change


4. JLAB External Group Projects

UITF (Perry, Radovic, Carlton)

Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.


5. JLAB External Lab Projects


LCLS2 (Dixon)

Recovery compressor skids electrical is being cleaned up

Guard Vacuum Skid electrical is about 95% complete

Two water skids are in checking phase

Bayonets. Jay is working slightly ahead of schedule.


6. Summer Maintenance Work Plan (All)

PRIORITY

CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)

ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)

ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)

ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)

CHL1 and CHL2 electrical maintenance including controls

CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)

Add e-stop guards on all systems (engineering/design $, parts $, labor $)

CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime

CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)

CHL2 compressor bellows restraint rods


POSSIBLE

CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)

CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)

CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)

CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)

Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)

CHL/FEL shield utube (engineering/design $, parts $, labor $)

CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime

CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)

SBR CBX Isolation (engineering/design $, parts $, labor $$??)

SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)

SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime

ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)

CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)

CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already

CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)

CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)

CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.


7. Long Range Plans (Wilson, Creel)

Jobs we are considering in no particular order


? Action Items

1.