Meeting Feb 06, 2016
Attendance
Creel, Scanlon, Oren, Dixon, Bevins, Arenius
Agenda and Notes
1. Manpower
Rotendra starts in one week. He will start on LCLS2.
New LCLS2 manpower plan anticipated by Monday next week so we can plan.
2. Project
The 2K FDR is scheduled 9 Mar at JLAB.
Controls design workshop is at SLAC 8 Feb. Scanlon says requirements keep changing. It was a procurement readiness review but now they are asking for ICD's FRS's etc. Post review should allow Chris to release gas management and utility ($500K) and then the 4K and 2K cold boxes ($500K) (paperwork is at 80% complete).
Ancillary equipment specs at SLAC for signatures (MCC, generator, UPS)
Internal 2K piping is being worked with Hung yu and Damon Rath.
Smith groups review of the installation package is complete. They came up with a number of recommendations. Dana needs help identifying locations of field mounted devices.
3. Recovery Compressor Progress
Assembling frames and piping components.
4. Additional work
There is more potential fabrication work for a turbine and cold compressor water skid.
Fabrication bayonets
Action Items
1. Dana is kicking in money to add a PC and overhead monitor to the small conference room.
2.