Difference between revisions of "11/14/2017 Meeting"

From Cryowiki
Jump to navigationJump to search
 
(3 intermediate revisions by the same user not shown)
Line 21: Line 21:
 
3. JLAB Internal Group Projects
 
3. JLAB Internal Group Projects
  
GPP (Yang, Thilan)
+
'''GPP (Yang, Thilan)'''
  
'''Kinney Pump Relocation'''
+
Kinney Pump Relocation
  
  
'''Main Gas and Recovery Gas Management Systems'''
+
Main Gas and Recovery Gas Management Systems
  
 
 
CHL to FEL Utubes (Perry, Corey)
 
  
 +
CTF C3 Interstage Heat Exchanger Removal
  
ESR Summer Maintenance Plan (Schleeper, Radovic, Carlton)
+
 
  
Change adsorber carbon. Replace CAMAC controls. Electrical and control system maintenance.
 
  
 +
Install redundant 12V power supplies for cryo cons
  
CHL1 Regeneration Skid Removal (Schleeper, Thompson)
 
-Helium line can be isolated and blanked at anytime with LOTO.
 
-Water lines can be blanked when CHL1 is down and water is isolated.
 
-Vacuum line can be isolated when CHL1 cold box is off line and warm.
 
  
 +
'''CHL to FEL Utubes (Perry, Corey)'''
  
  
4. JLAB External Group Projects
+
'''CHL1 Regeneration Skid Removal (Schleeper, Thompson)'''
  
UITF (Perry, Radovic, Carlton)
+
-Helium line can be isolated and blanked at anytime with LOTO.
 +
-Water lines isolated.
 +
-Vacuum line can be isolated when CHL1 cold box is off line and warm.
  
Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum.
 
  
 +
Change SC1 and SC2 batteries change
  
  
CHL2 Main Compressor Oil Level Alarms (Saringer, Wright)
+
4. JLAB External Group Projects
  
 +
'''UITF (Perry, Radovic, Carlton)'''
  
CHL
+
Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.
  
Inspection of Relief Devices per Pressure System's Requirement: Started CTF and CHL2. Meeting yesterday to decide path forward. Alicia is writing several task hazard analysis, CTList, TOSP. We are running out of time.
 
  
  
 +
5. JLAB External Lab Projects
  
5. JLAB External Projects
 
  
 +
'''LCLS2 (Dixon)'''
  
LCLS2 (Dixon)
+
Recovery compressor skids electrical is being cleaned up
  
We are building two recovery compressors. Due in July 17'. (Issac) We are building a guard vac skid for LCLS2. Not started. Due end of October 17'(Issac). We might also fabricate a water skid. FDR for 2K cold box Mar 9. Issac and Stapleton found grit or metal shavings in the inlet piping of the compressor. Bill Crahen is investigating.
+
Guard Vacuum Skid electrical is about 95% complete
  
We are starting to buy hardware to build 230 bayonets in approximately 6-7 months.
+
Two water skids are in checking phase
  
Shop is starting to cut metal for the vacuum skid.
+
Bayonets. Jay is working slightly ahead of schedule.
  
  
CTF CMTF Junction Box
+
6. Summer Maintenance Work Plan (All)
  
Repair of EV245RT Coming up with preliminary design for applying force without an EV. Drawings are under review.
+
PRIORITY
  
 +
CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)
  
 +
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
  
 +
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
  
 
+
ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)
6. Summer Maintenance Work Plan (All)
 
 
 
PRIORITY
 
  
 
CHL1 and CHL2 electrical maintenance including controls
 
CHL1 and CHL2 electrical maintenance including controls
 
GPP CTF gas management skid and Kinney piping move (engineering/design $$, parts $$$, labor $$$)
 
  
 
CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)
 
CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)
 
  
 
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
 
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
 
SC1 Vacuum Controls (engineering/design 0, parts 0, labor $)
 
 
CHL1 C3 - Load Valve Readback and Power-meter (engineering/design ?, parts ?, labor ?) - Can be done anytime
 
  
 
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
 
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
Line 102: Line 94:
 
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
 
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
  
CHL Hurricane Relief System - EV for SLinac not functional (engineering/design ?, parts ?, labor ?)
+
CHL2 compressor bellows restraint rods
  
  
Line 110: Line 102:
  
 
CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)
 
CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)
 
 
NOT POSSIBLE
 
  
 
CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)
 
CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)
Line 146: Line 135:
  
  
7. Long Range Plans (Wright, Creel)
+
7. Long Range Plans (Wilson, Creel)
  
 
Jobs we are considering in no particular order
 
Jobs we are considering in no particular order
  
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
 
  
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
 
  
 
?
 
?
 
Action Items
 
Action Items
 
1.
 
 
2. Before next meeting the persons whose name appears beside an item will write a short update.
 
 
3. Complete summer maintenance list
 
 
4. Need to start thinking about a new 2K cold box design using FRIB/LCLS2 cold compressor designs.
 
 
5. Need to start pushing the engineering/design effort forward for the ESR2 plant.
 
 
 
Action Item Updates
 
  
 
1.
 
1.

Latest revision as of 14:13, 14 November 2017

Attendance

Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,


Goals

The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.


Agenda and Notes

1. Safety


2. Schedule

Plan is to run CHL1 and CHL2 at 2K until mid March.


3. JLAB Internal Group Projects

GPP (Yang, Thilan)

Kinney Pump Relocation


Main Gas and Recovery Gas Management Systems


CTF C3 Interstage Heat Exchanger Removal



Install redundant 12V power supplies for cryo cons


CHL to FEL Utubes (Perry, Corey)


CHL1 Regeneration Skid Removal (Schleeper, Thompson)

-Helium line can be isolated and blanked at anytime with LOTO. -Water lines isolated. -Vacuum line can be isolated when CHL1 cold box is off line and warm.


Change SC1 and SC2 batteries change


4. JLAB External Group Projects

UITF (Perry, Radovic, Carlton)

Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.


5. JLAB External Lab Projects


LCLS2 (Dixon)

Recovery compressor skids electrical is being cleaned up

Guard Vacuum Skid electrical is about 95% complete

Two water skids are in checking phase

Bayonets. Jay is working slightly ahead of schedule.


6. Summer Maintenance Work Plan (All)

PRIORITY

CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)

ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)

ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)

ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)

CHL1 and CHL2 electrical maintenance including controls

CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)

Add e-stop guards on all systems (engineering/design $, parts $, labor $)

CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime

CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)

CHL2 compressor bellows restraint rods


POSSIBLE

CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)

CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)

CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)

CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)

Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)

CHL/FEL shield utube (engineering/design $, parts $, labor $)

CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime

CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)

SBR CBX Isolation (engineering/design $, parts $, labor $$??)

SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)

SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime

ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)

CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)

CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already

CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)

CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)

CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.


7. Long Range Plans (Wilson, Creel)

Jobs we are considering in no particular order


? Action Items

1.