==MSU FRIB==
 
==MSU FRIB==
Organize and publish pressure system documentation for main compressor system
+
Organize and publish pressure system documentation
* Review and correct errors in relief valve calc sheets
+
* Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
* Publish main compressor system data to MSU via personal website and confirm receipt
+
* Complete and publish pressure system documentation for helium gas storage and other warm systems
  
 
Review 3 atm helium model in cold box room
 
Review 3 atm helium model in cold box room
Line 12: Line 12:
 
[[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]]
 
[[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]]
 
* Prepare 2k cold box design materials for February 2017 FDR
 
* Prepare 2k cold box design materials for February 2017 FDR
 
Review and evaluate bids for purifier
 
* by COB Wednesday 1/25/17
 
  
 
==JLab==
 
==JLab==

Latest revision as of 17:06, 25 January 2017

MSU FRIB

Organize and publish pressure system documentation

  • Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
  • Complete and publish pressure system documentation for helium gas storage and other warm systems

Review 3 atm helium model in cold box room

  • Create u-tube purge plan in cold box room

Review LS2 cooldown transfer line segment

SLAC LCLS-II

SLAC LCLS-II 2K cold box

  • Prepare 2k cold box design materials for February 2017 FDR

JLab

Organize cryo pressure systems

  • to supersede existing cryo pressure systems work package filing system
  • to provide a place for filing recurring inspections of systems and equipment
  • to provide a place for documenting future repairs/alterations
  • to integrate with the pressure systems work being done by other groups