==MSU FRIB== | ==MSU FRIB== | ||
− | Organize and publish pressure system documentation | + | Organize and publish pressure system documentation |
− | * | + | * Complete relief valve calc sheets for thermal reliefs and utility system process reliefs |
− | * | + | * Complete and publish pressure system documentation for helium gas storage and other warm systems |
Review 3 atm helium model in cold box room | Review 3 atm helium model in cold box room | ||
Line 12: | Line 12: | ||
[[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]] | [[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]] | ||
* Prepare 2k cold box design materials for February 2017 FDR | * Prepare 2k cold box design materials for February 2017 FDR | ||
− | |||
− | |||
− | |||
==JLab== | ==JLab== |
Latest revision as of 17:06, 25 January 2017
MSU FRIB
Organize and publish pressure system documentation
- Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
- Complete and publish pressure system documentation for helium gas storage and other warm systems
Review 3 atm helium model in cold box room
- Create u-tube purge plan in cold box room
Review LS2 cooldown transfer line segment
SLAC LCLS-II
- Prepare 2k cold box design materials for February 2017 FDR
JLab
Organize cryo pressure systems
- to supersede existing cryo pressure systems work package filing system
- to provide a place for filing recurring inspections of systems and equipment
- to provide a place for documenting future repairs/alterations
- to integrate with the pressure systems work being done by other groups