'''Outstanding work items'''
+
Organize and publish pressure system documentation
 +
* Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
 +
* Complete and publish pressure system documentation for helium gas storage and other warm systems
  
* Update flexibility analysis of large main helium piping in cold box room and compressor room; perform calculations for hangers and supports
+
Review 3 atm helium model in cold box room
* Organize and publish pressure system documentation for main compressor system
 
 
* Create u-tube purge plan in cold box room
 
* Create u-tube purge plan in cold box room
* Review 3 atm helium model in cold box room
+
 
 +
Review LS2 cooldown transfer line segment
 +
 
 +
==SLAC LCLS-II==
 +
[[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]]
 +
* Prepare 2k cold box design materials for February 2017 FDR
 +
 
 +
==JLab==
 +
Organize cryo pressure systems
 +
* to supersede existing cryo pressure systems work package filing system
 +
* to provide a place for filing recurring inspections of systems and equipment
 +
* to provide a place for documenting future repairs/alterations
 +
* to integrate with the pressure systems work being done by other groups

Latest revision as of 17:06, 25 January 2017

MSU FRIB

Organize and publish pressure system documentation

  • Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
  • Complete and publish pressure system documentation for helium gas storage and other warm systems

Review 3 atm helium model in cold box room

  • Create u-tube purge plan in cold box room

Review LS2 cooldown transfer line segment

SLAC LCLS-II

SLAC LCLS-II 2K cold box

  • Prepare 2k cold box design materials for February 2017 FDR

JLab

Organize cryo pressure systems

  • to supersede existing cryo pressure systems work package filing system
  • to provide a place for filing recurring inspections of systems and equipment
  • to provide a place for documenting future repairs/alterations
  • to integrate with the pressure systems work being done by other groups