Difference between revisions of "Nate Laverdure work items"
From Cryowiki
Jump to navigationJump to search(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==MSU FRIB== | ==MSU FRIB== | ||
− | Organize and publish pressure system documentation for | + | Organize and publish pressure system documentation |
− | * | + | * Complete relief valve calc sheets for thermal reliefs and utility system process reliefs |
− | + | * Complete and publish pressure system documentation for helium gas storage and other warm systems | |
Review 3 atm helium model in cold box room | Review 3 atm helium model in cold box room | ||
Line 10: | Line 10: | ||
==SLAC LCLS-II== | ==SLAC LCLS-II== | ||
− | [[SLAC LCLS-II 2K | + | [[ SLAC LCLS-II 2K cold box | SLAC LCLS-II 2K cold box]] |
* Prepare 2k cold box design materials for February 2017 FDR | * Prepare 2k cold box design materials for February 2017 FDR | ||
Latest revision as of 17:06, 25 January 2017
MSU FRIB
Organize and publish pressure system documentation
- Complete relief valve calc sheets for thermal reliefs and utility system process reliefs
- Complete and publish pressure system documentation for helium gas storage and other warm systems
Review 3 atm helium model in cold box room
- Create u-tube purge plan in cold box room
Review LS2 cooldown transfer line segment
SLAC LCLS-II
- Prepare 2k cold box design materials for February 2017 FDR
JLab
Organize cryo pressure systems
- to supersede existing cryo pressure systems work package filing system
- to provide a place for filing recurring inspections of systems and equipment
- to provide a place for documenting future repairs/alterations
- to integrate with the pressure systems work being done by other groups