Difference between revisions of "02/23/2017 Meeting"
(Created page with " == Attendance == Thompson, Creel, Dixon, Michalski, Oren, Arenius == Agenda and Notes == '''1. Operations ''' MFA No one from cryo has access to the operations screen...") |
|||
Line 2: | Line 2: | ||
== Attendance == | == Attendance == | ||
− | Thompson, Creel, Dixon, Michalski | + | Thompson, Creel, Dixon, Michalski, Arenius |
Line 13: | Line 13: | ||
No one from cryo has access to the operations screens from home. I have called Kowalski, helpdesk, and put in a CCPR. | No one from cryo has access to the operations screens from home. I have called Kowalski, helpdesk, and put in a CCPR. | ||
+ | |||
+ | MFA do not support MACs yet. CS is working on a solution. | ||
Line 18: | Line 20: | ||
Normal | Normal | ||
+ | |||
+ | C100 heaters have been changed to Independent because they cant any extra heat on in them or it increases the microphonics/quench issues. | ||
CHL1 | CHL1 | ||
+ | Normal | ||
CHL2 | CHL2 | ||
Normal | Normal | ||
− | |||
ESR | ESR | ||
− | Hall C believes the high SHMS back pressure is because of the flexible anaconda. | + | Hall C believes the high SHMS back pressure is because of the flexible anaconda. Hall C changed the anaconda but it did not help. Transferline flow has been redirected from dewar to Hall supply to shore up 3atm pressure. More tuning for this mode is needed. |
− | |||
CTF | CTF | ||
− | + | The CTF shutdown is underway. The warm work was completed. | |
− | |||
− | The CTF shutdown is | ||
HDR | HDR | ||
− | Normal. | + | Normal. Tim is learning to tune the LN2 valve. |
Line 51: | Line 52: | ||
UIM | UIM | ||
− | Shutdown | + | Shutdown is underway. |
Line 61: | Line 62: | ||
MSU | MSU | ||
− | Working to accumulate the pressure systems documentation. | + | Working to accumulate the pressure systems documentation. Meeting with Fabio on Friday. |
Line 67: | Line 68: | ||
Ritendra starts today he will be assigned to the LCLS2 Monday to help with controls. The ECAD designer was extended through May. | Ritendra starts today he will be assigned to the LCLS2 Monday to help with controls. The ECAD designer was extended through May. | ||
− | |||
'''3. Manpower ''' | '''3. Manpower ''' | ||
− | Ritendra | + | Ritendra started. He has an office and has a computer. He is working on LCLS2. |
Line 82: | Line 82: | ||
2. New director starts Apr 3. | 2. New director starts Apr 3. | ||
− | 3. | + | 3. We have been asked to provide a feasibility study for putting an LCLS2 module in LERF. |
− | 4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 | + | 4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 on 23 March. We are moving ahead with fabrication of the piping spools for this job. |
5. LERF is still hoping to get the medical isotope contract in 18' | 5. LERF is still hoping to get the medical isotope contract in 18' |
Latest revision as of 08:56, 23 February 2017
Attendance
Thompson, Creel, Dixon, Michalski, Arenius
Agenda and Notes
1. Operations
MFA
No one from cryo has access to the operations screens from home. I have called Kowalski, helpdesk, and put in a CCPR.
MFA do not support MACs yet. CS is working on a solution.
LINAC
Normal
C100 heaters have been changed to Independent because they cant any extra heat on in them or it increases the microphonics/quench issues.
CHL1
Normal
CHL2
Normal
ESR
Hall C believes the high SHMS back pressure is because of the flexible anaconda. Hall C changed the anaconda but it did not help. Transferline flow has been redirected from dewar to Hall supply to shore up 3atm pressure. More tuning for this mode is needed.
CTF
The CTF shutdown is underway. The warm work was completed.
HDR
Normal. Tim is learning to tune the LN2 valve.
2. Projects
UIM
Shutdown is underway.
UITF
Thermosiphon is being fabricated.
MSU
Working to accumulate the pressure systems documentation. Meeting with Fabio on Friday.
LCLS2
Ritendra starts today he will be assigned to the LCLS2 Monday to help with controls. The ECAD designer was extended through May.
3. Manpower
Ritendra started. He has an office and has a computer. He is working on LCLS2.
4. Info from Will
1. LN2 contract proposals are in and have been routed to DOE for approval.
2. New director starts Apr 3.
3. We have been asked to provide a feasibility study for putting an LCLS2 module in LERF.
4. Funding could impact summer shutdown schedule possibly forcing the shutdown of CHL2 on 23 March. We are moving ahead with fabrication of the piping spools for this job.
5. LERF is still hoping to get the medical isotope contract in 18'
5. Other
Machie send out a request asking how many people still use ME10.
Action Items
1. Must keep meeting to no more than 30 minutes
2. Plan the replacement of the SC2 power feedthrus.
Action Item Updates
1. Kandice Carter took pictures of two of our new engineers for engineers week.
2.