Main Gas and Recovery Gas Management Systems
 
Main Gas and Recovery Gas Management Systems
 +
 +
 +
CTF C3 Interstage Heat Exchanger Removal
  
 
    
 
    
 +
 +
 +
Install redundant 12V power supplies for cryo cons
 +
 +
 
'''CHL to FEL Utubes (Perry, Corey)'''
 
'''CHL to FEL Utubes (Perry, Corey)'''
  
Line 35: Line 43:
  
 
-Helium line can be isolated and blanked at anytime with LOTO.
 
-Helium line can be isolated and blanked at anytime with LOTO.
-Water lines can be blanked when CHL1 is down and water is isolated.
+
-Water lines isolated.
 
-Vacuum line can be isolated when CHL1 cold box is off line and warm.
 
-Vacuum line can be isolated when CHL1 cold box is off line and warm.
  
 +
 +
Change SC1 and SC2 batteries change
  
  
Line 44: Line 54:
 
'''UITF (Perry, Radovic, Carlton)'''
 
'''UITF (Perry, Radovic, Carlton)'''
  
Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum.
+
Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.
 
 
  
  
Line 54: Line 63:
 
'''LCLS2 (Dixon)'''
 
'''LCLS2 (Dixon)'''
  
Recovery compressor skids
+
Recovery compressor skids electrical is being cleaned up
  
Guard Vacuum Skid
+
Guard Vacuum Skid electrical is about 95% complete
  
Bayonets
+
Two water skids are in checking phase
 +
 
 +
Bayonets. Jay is working slightly ahead of schedule.
  
  
Line 64: Line 75:
  
 
PRIORITY
 
PRIORITY
 +
 +
CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)
  
 
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
 
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
  
 
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
 
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
 +
 +
ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)
  
 
CHL1 and CHL2 electrical maintenance including controls
 
CHL1 and CHL2 electrical maintenance including controls
Line 74: Line 89:
  
 
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
 
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
 
SC1 Vacuum Controls (engineering/design 0, parts 0, labor $)
 
 
CHL1 C3 - Load Valve Readback and Power-meter (engineering/design ?, parts ?, labor ?) - Can be done anytime
 
  
 
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
 
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
Line 83: Line 94:
 
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
 
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
  
 +
CHL2 compressor bellows restraint rods
  
  

Latest revision as of 15:13, 14 November 2017

Attendance

Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,


Goals

The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.


Agenda and Notes

1. Safety


2. Schedule

Plan is to run CHL1 and CHL2 at 2K until mid March.


3. JLAB Internal Group Projects

GPP (Yang, Thilan)

Kinney Pump Relocation


Main Gas and Recovery Gas Management Systems


CTF C3 Interstage Heat Exchanger Removal



Install redundant 12V power supplies for cryo cons


CHL to FEL Utubes (Perry, Corey)


CHL1 Regeneration Skid Removal (Schleeper, Thompson)

-Helium line can be isolated and blanked at anytime with LOTO. -Water lines isolated. -Vacuum line can be isolated when CHL1 cold box is off line and warm.


Change SC1 and SC2 batteries change


4. JLAB External Group Projects

UITF (Perry, Radovic, Carlton)

Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.


5. JLAB External Lab Projects


LCLS2 (Dixon)

Recovery compressor skids electrical is being cleaned up

Guard Vacuum Skid electrical is about 95% complete

Two water skids are in checking phase

Bayonets. Jay is working slightly ahead of schedule.


6. Summer Maintenance Work Plan (All)

PRIORITY

CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)

ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)

ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)

ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)

CHL1 and CHL2 electrical maintenance including controls

CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)

Add e-stop guards on all systems (engineering/design $, parts $, labor $)

CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime

CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)

CHL2 compressor bellows restraint rods


POSSIBLE

CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)

CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)

CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)

CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)

Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)

CHL/FEL shield utube (engineering/design $, parts $, labor $)

CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime

CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)

SBR CBX Isolation (engineering/design $, parts $, labor $$??)

SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)

SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime

ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)

CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)

CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already

CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)

CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)

CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.


7. Long Range Plans (Wilson, Creel)

Jobs we are considering in no particular order


? Action Items