Jump to navigationJump to search (Created page with "<strong>SLAC LCLS-II 2K cold box</strong> '''Outstanding design issues''' * make configurations of model to show what is in scope of AL, remote assembler, shipper, field inst...") |
|||
Line 2: | Line 2: | ||
'''Outstanding design issues''' | '''Outstanding design issues''' | ||
+ | * move 2k cold box north to create clearance for transfer line | ||
+ | * clear all interferences created by moving cold box nortg (move control cabinets and manway) | ||
* make configurations of model to show what is in scope of AL, remote assembler, shipper, field installer, and operator | * make configurations of model to show what is in scope of AL, remote assembler, shipper, field installer, and operator | ||
− | |||
− | |||
* make it possible to add shear pins to assembly AFTER delivery to reduce maximum shipping height | * make it possible to add shear pins to assembly AFTER delivery to reduce maximum shipping height | ||
− | |||
* add straightener assemblies to CC inlet spools | * add straightener assemblies to CC inlet spools | ||
* thermal relief design iteration | * thermal relief design iteration | ||
Line 18: | Line 17: | ||
* can overall height be reduced any lower than 14 ft? | * can overall height be reduced any lower than 14 ft? | ||
* can we get a more accurate weight estimate? | * can we get a more accurate weight estimate? | ||
+ | * is it possible to ship in this configuration? | ||
+ | * what will be the expected shipping loads (accelerations)? | ||
+ | * can we cut the shipping costs a LOT by making small changes to the dimensions? | ||
'''Completed''' | '''Completed''' | ||
+ | * (in coordination with Randy) decide where to locate the process relief/blowdown; we have decided to move this into the scope of the interface box | ||
+ | * (in coordination with Cindy) decide whether to move north to create clearance for next transfer line; YES | ||
+ | * (in coordination with Cindy) decide whether to coordinate 9-1/4" bayonet heights and locations with next transfer line; NO these bayonet heights will not be coordinated | ||
+ | * add 6" o-ring ANSI flange for diffusion pump connection | ||
* publish corrected model of CC inlet and outlet spools to allow the flex analysis to proceed | * publish corrected model of CC inlet and outlet spools to allow the flex analysis to proceed | ||
* lower 9-1/4" bayonets and valves to reduce maximum shipping height | * lower 9-1/4" bayonets and valves to reduce maximum shipping height | ||
Line 26: | Line 32: | ||
* make initial estimate of shipping size and weight | * make initial estimate of shipping size and weight | ||
* How to attach spools to outlet nozzles of small CCs (especially CC6) | * How to attach spools to outlet nozzles of small CCs (especially CC6) | ||
− | * Manway downsize | + | * Manway downsize; NO |
Revision as of 12:57, 19 January 2017
SLAC LCLS-II 2K cold box
Outstanding design issues
- move 2k cold box north to create clearance for transfer line
- clear all interferences created by moving cold box nortg (move control cabinets and manway)
- make configurations of model to show what is in scope of AL, remote assembler, shipper, field installer, and operator
- make it possible to add shear pins to assembly AFTER delivery to reduce maximum shipping height
- add straightener assemblies to CC inlet spools
- thermal relief design iteration
- heater final design based on finned tubing and heater cartridge quotes
- MLI attachment
- details of instrumentation tubing and panel arrangements
- incorporate internal shipping and seismic supports as a result of piping flex analysis
Questions
- can overall height be reduced any lower than 14 ft?
- can we get a more accurate weight estimate?
- is it possible to ship in this configuration?
- what will be the expected shipping loads (accelerations)?
- can we cut the shipping costs a LOT by making small changes to the dimensions?
Completed
- (in coordination with Randy) decide where to locate the process relief/blowdown; we have decided to move this into the scope of the interface box
- (in coordination with Cindy) decide whether to move north to create clearance for next transfer line; YES
- (in coordination with Cindy) decide whether to coordinate 9-1/4" bayonet heights and locations with next transfer line; NO these bayonet heights will not be coordinated
- add 6" o-ring ANSI flange for diffusion pump connection
- publish corrected model of CC inlet and outlet spools to allow the flex analysis to proceed
- lower 9-1/4" bayonets and valves to reduce maximum shipping height
- move process relief/blowdown iteration out of the scope of the 2k box
- make initial estimate of shipping size and weight
- How to attach spools to outlet nozzles of small CCs (especially CC6)
- Manway downsize; NO