== Action Items ==
 
== Action Items ==
#    investigate bearing gas process at ESR
+
#    investigate bearing gas process at ESR// T2 uses bearing gas upon start up.  T1 uses no bearing gas.
#    Verify LVDT on turbine inlet valve
+
#    Verify LVDT on turbine inlet valve//  Can we do this during the T2 warm up?
#    Warm T2. Schedule. Dependent on transfer line.
+
#    Warm T2. Schedule. Dependent on transfer line. // Transfer line is available
 
#    Check seating force of T2 inlet valve (require trip?) (verify proper operation)
 
#    Check seating force of T2 inlet valve (require trip?) (verify proper operation)
#    Can T2 be isolated to support troubleshooting without damaging turbine or stopping entire CBX?
+
#    Can T2 be isolated to support troubleshooting without damaging turbine or stopping entire CBX?  //Possibly during warm up?
 
#    Develop plan to isolate CBX in the event T2 must be stopped, and/or CBX must be tripped.
 
#    Develop plan to isolate CBX in the event T2 must be stopped, and/or CBX must be tripped.
#    Verify that we have a spare.
+
#    Verify that we have a spare.//we have a spare for each ESR turbine
 
#    What is required to check seating force (operationally)?
 
#    What is required to check seating force (operationally)?
 
#    Create an alarm that will alert us when turbine inlet valves are closed and turbine speed is > 0.
 
#    Create an alarm that will alert us when turbine inlet valves are closed and turbine speed is > 0.
#    drink a beer
+
#    drink a beer/  complete.  will perform again 1/23
#    Get the transfer line from CHL operational
+
#    Get the transfer line from CHL operational// done.
#    follow-up meeting ~1/20/2017.
+
#    follow-up meeting ~1/20/2017.   // 1/23
#    Contact Pete to begin information/data collection, vendors, contacts.
+
#    Contact Pete to begin information/data collection, vendors, contacts.//went through Nussair and it is believed to be the information we needed.
 
#    Is there an IA isolation valve that can be used so the IA solenoid valve can be replaced?
 
#    Is there an IA isolation valve that can be used so the IA solenoid valve can be replaced?
 
#    Do we have a replacement solenoid valve for the IA to the inlet valve solenoid?
 
#    Do we have a replacement solenoid valve for the IA to the inlet valve solenoid?

Revision as of 14:13, 23 January 2017

Attendance

J. Creel K. Dixon M. Wright R. Norton D. Schleeper S. Radovic

Issue Statement

  • When T2 at ESR trips off, the turbine continues to spin much longer than expected. There is a concern that the turbine will be damaged if it does not stop spinning when the inlet valve is closed. On a few occasions, the turbine continued to spin (~500Hz) until the the plant was re-started.

ESR Turbines 170118.PNG File:ESR T2 Trip (Jan 8, 2017).pdf https://logbooks.jlab.org/entry/3449986

Agenda and Notes

1. What do we need to do to fix this problem.

  -Several things can be done to correct the issue.  The least impact (from an operational view) would be to isolate and warm up the turbine temporarily.

2. Is this really a problem (I think that this is a big problem)

  -Absolutely.  The bearing gas system isn't yet fully understood.  Regardless, a turbine spinning when bearing gas is not active would certainly wear the turbine.

3. Why do we think this is a problem (Is bearing gas on during that time)

  -See above.

4. Should we be doing something manually?

  -For long outages, consider closing the manual valve on the T2 outlet.

5. Other questions that we need to make sure we have answered.

Action Items

  1. investigate bearing gas process at ESR// T2 uses bearing gas upon start up. T1 uses no bearing gas.
  2. Verify LVDT on turbine inlet valve// Can we do this during the T2 warm up?
  3. Warm T2. Schedule. Dependent on transfer line. // Transfer line is available
  4. Check seating force of T2 inlet valve (require trip?) (verify proper operation)
  5. Can T2 be isolated to support troubleshooting without damaging turbine or stopping entire CBX? //Possibly during warm up?
  6. Develop plan to isolate CBX in the event T2 must be stopped, and/or CBX must be tripped.
  7. Verify that we have a spare.//we have a spare for each ESR turbine
  8. What is required to check seating force (operationally)?
  9. Create an alarm that will alert us when turbine inlet valves are closed and turbine speed is > 0.
  10. drink a beer/ complete. will perform again 1/23
  11. Get the transfer line from CHL operational// done.
  12. follow-up meeting ~1/20/2017. // 1/23
  13. Contact Pete to begin information/data collection, vendors, contacts.//went through Nussair and it is believed to be the information we needed.
  14. Is there an IA isolation valve that can be used so the IA solenoid valve can be replaced?
  15. Do we have a replacement solenoid valve for the IA to the inlet valve solenoid?