Difference between revisions of "11/14/2017 Meeting"
Line 23: | Line 23: | ||
'''GPP (Yang, Thilan)''' | '''GPP (Yang, Thilan)''' | ||
− | + | Kinney Pump Relocation | |
− | + | Main Gas and Recovery Gas Management Systems | |
Line 32: | Line 32: | ||
− | ''' | + | '''CHL1 Regeneration Skid Removal (Schleeper, Thompson)''' |
− | |||
− | |||
− | |||
− | |||
− | CHL1 Regeneration Skid Removal (Schleeper, Thompson) | ||
-Helium line can be isolated and blanked at anytime with LOTO. | -Helium line can be isolated and blanked at anytime with LOTO. | ||
-Water lines can be blanked when CHL1 is down and water is isolated. | -Water lines can be blanked when CHL1 is down and water is isolated. | ||
Line 46: | Line 41: | ||
4. JLAB External Group Projects | 4. JLAB External Group Projects | ||
− | UITF (Perry, Radovic, Carlton) | + | '''UITF (Perry, Radovic, Carlton)''' |
Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum. | Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum. | ||
Line 52: | Line 47: | ||
− | |||
+ | 5. JLAB External Lab Projects | ||
− | |||
− | + | '''LCLS2 (Dixon)''' | |
+ | Recovery compressor skids | ||
+ | Guard Vacuum Skid | ||
− | + | Bayonets | |
− | + | 6. Summer Maintenance Work Plan (All) | |
− | + | PRIORITY | |
− | + | ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$) | |
− | + | ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
CHL1 and CHL2 electrical maintenance including controls | CHL1 and CHL2 electrical maintenance including controls | ||
− | |||
− | |||
CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $) | CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $) | ||
− | |||
Add e-stop guards on all systems (engineering/design $, parts $, labor $) | Add e-stop guards on all systems (engineering/design $, parts $, labor $) | ||
Line 102: | Line 82: | ||
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $) | CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $) | ||
− | |||
Line 110: | Line 89: | ||
CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $) | CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $) | ||
− | |||
− | |||
− | |||
CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$) | CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$) | ||
Line 146: | Line 122: | ||
− | 7. Long Range Plans ( | + | 7. Long Range Plans (Wilson, Creel) |
Jobs we are considering in no particular order | Jobs we are considering in no particular order | ||
− | |||
− | |||
? | ? | ||
Action Items | Action Items | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
1. | 1. |
Revision as of 14:10, 14 November 2017
Attendance
Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,
Goals
The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.
Agenda and Notes
1. Safety
2. Schedule
Plan is to run CHL1 and CHL2 at 2K until mid March.
3. JLAB Internal Group Projects
GPP (Yang, Thilan)
Kinney Pump Relocation
Main Gas and Recovery Gas Management Systems
CHL to FEL Utubes (Perry, Corey)
CHL1 Regeneration Skid Removal (Schleeper, Thompson)
-Helium line can be isolated and blanked at anytime with LOTO.
-Water lines can be blanked when CHL1 is down and water is isolated.
-Vacuum line can be isolated when CHL1 cold box is off line and warm.
4. JLAB External Group Projects
UITF (Perry, Radovic, Carlton)
Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum.
5. JLAB External Lab Projects
LCLS2 (Dixon)
Recovery compressor skids
Guard Vacuum Skid
Bayonets
6. Summer Maintenance Work Plan (All)
PRIORITY
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
CHL1 and CHL2 electrical maintenance including controls
CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
SC1 Vacuum Controls (engineering/design 0, parts 0, labor $)
CHL1 C3 - Load Valve Readback and Power-meter (engineering/design ?, parts ?, labor ?) - Can be done anytime
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
POSSIBLE
CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)
CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)
CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)
CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)
Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)
CHL/FEL shield utube (engineering/design $, parts $, labor $)
CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime
CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)
SBR CBX Isolation (engineering/design $, parts $, labor $$??)
SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)
SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime
ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)
CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)
CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already
CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)
CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)
CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.
7. Long Range Plans (Wilson, Creel)
Jobs we are considering in no particular order
? Action Items
1.