Main Gas and Recovery Gas Management Systems | Main Gas and Recovery Gas Management Systems | ||
+ | |||
+ | |||
+ | CTF C3 Interstage Heat Exchanger Removal | ||
+ | |||
+ | |||
+ | Install redundant 12V power supplies for cryo cons | ||
+ | |||
+ | |||
'''CHL to FEL Utubes (Perry, Corey)''' | '''CHL to FEL Utubes (Perry, Corey)''' | ||
Line 35: | Line 43: | ||
-Helium line can be isolated and blanked at anytime with LOTO. | -Helium line can be isolated and blanked at anytime with LOTO. | ||
− | -Water lines | + | -Water lines isolated. |
-Vacuum line can be isolated when CHL1 cold box is off line and warm. | -Vacuum line can be isolated when CHL1 cold box is off line and warm. | ||
+ | |||
+ | Change SC1 and SC2 batteries change | ||
Line 44: | Line 54: | ||
'''UITF (Perry, Radovic, Carlton)''' | '''UITF (Perry, Radovic, Carlton)''' | ||
− | Thermosiphon | + | Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished. |
− | |||
Line 54: | Line 63: | ||
'''LCLS2 (Dixon)''' | '''LCLS2 (Dixon)''' | ||
− | Recovery compressor skids | + | Recovery compressor skids electrical is being cleaned up |
− | Guard Vacuum Skid | + | Guard Vacuum Skid electrical is about 95% complete |
− | Bayonets | + | Two water skids are in checking phase |
+ | |||
+ | Bayonets. Jay is working slightly ahead of schedule. | ||
Line 64: | Line 75: | ||
PRIORITY | PRIORITY | ||
+ | |||
+ | CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$) | ||
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$) | ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$) | ||
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$) | ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$) | ||
+ | |||
+ | ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$) | ||
CHL1 and CHL2 electrical maintenance including controls | CHL1 and CHL2 electrical maintenance including controls | ||
Line 74: | Line 89: | ||
Add e-stop guards on all systems (engineering/design $, parts $, labor $) | Add e-stop guards on all systems (engineering/design $, parts $, labor $) | ||
− | |||
− | |||
− | |||
− | |||
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime | CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime | ||
Line 83: | Line 94: | ||
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $) | CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $) | ||
+ | CHL2 compressor bellows restraint rods | ||
Latest revision as of 15:13, 14 November 2017
Attendance
Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,
Goals
The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.
Agenda and Notes
1. Safety
2. Schedule
Plan is to run CHL1 and CHL2 at 2K until mid March.
3. JLAB Internal Group Projects
GPP (Yang, Thilan)
Kinney Pump Relocation
Main Gas and Recovery Gas Management Systems
CTF C3 Interstage Heat Exchanger Removal
Install redundant 12V power supplies for cryo cons
CHL to FEL Utubes (Perry, Corey)
CHL1 Regeneration Skid Removal (Schleeper, Thompson)
-Helium line can be isolated and blanked at anytime with LOTO. -Water lines isolated. -Vacuum line can be isolated when CHL1 cold box is off line and warm.
Change SC1 and SC2 batteries change
4. JLAB External Group Projects
UITF (Perry, Radovic, Carlton)
Thermosiphon installed and pressure test complete. Utubes have been fabricated. Controls need to be finished.
5. JLAB External Lab Projects
LCLS2 (Dixon)
Recovery compressor skids electrical is being cleaned up
Guard Vacuum Skid electrical is about 95% complete
Two water skids are in checking phase
Bayonets. Jay is working slightly ahead of schedule.
6. Summer Maintenance Work Plan (All)
PRIORITY
CHL1 SC1R Piping Modifications (engineering/design $, parts $, labor $$)
ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)
ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)
ESR Relief valve validation (engineering/design $$$, parts $$$, labor $$$)
CHL1 and CHL2 electrical maintenance including controls
CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)
Add e-stop guards on all systems (engineering/design $, parts $, labor $)
CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime
CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)
CHL2 compressor bellows restraint rods
POSSIBLE
CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)
CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)
CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)
CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)
Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)
CHL/FEL shield utube (engineering/design $, parts $, labor $)
CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime
CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)
SBR CBX Isolation (engineering/design $, parts $, labor $$??)
SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)
SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime
ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)
CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)
CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already
CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)
CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)
CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.
7. Long Range Plans (Wilson, Creel)
Jobs we are considering in no particular order
? Action Items
1.