Difference between revisions of "01/19/2017 Meeting"

From Cryowiki
Jump to navigationJump to search
(Created page with " == Attendance == Thompson, Creel, Dixon, Oren, Michalski == Agenda and Notes == Snow is predicted for Saturday. Mat is managing the LN2 delivery. He might possibly top e...")
 
Line 6: Line 6:
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
 
 
Snow is predicted for Saturday. Mat is managing the LN2 delivery. He might possibly top everything off on Friday and then cancel the trucks for Saturday or same for Saturday and Sunday.
 
  
  
Line 15: Line 12:
 
LINAC
 
LINAC
  
Plan is to transition to 2K on Monday.
+
LINAC's at 2K
 +
 
 +
Some controls issues were reported with new IOC restore routines for RF. Routine was intermittently restoring heat values to manual with zero heat.
  
  
Line 23: Line 22:
 
Normal.
 
Normal.
  
Wheel did get to AL/S2M.
+
No updates from AL/S2M.
  
  
Line 33: Line 32:
 
ESR
 
ESR
  
Normal. There was a shutdown of the plant due to loss of cooling tower power. The water chemistry line broke and sprayed an electrical panel that caused a breaker trip. FM temporarily corrected the problem.Hall C has continued testing magnets successfully.
+
Normal.  
Plant was restarted successfully and Halls recooled.
+
 
 +
Transferline valve is not functioning. The guys have a plan to change the CAMAC card this morning.
 +
 
 +
Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.
 +
 
 +
 
  
 
CTF
 
CTF
Line 40: Line 44:
 
Normal
 
Normal
  
Kinney #2 ring pump spun a bearing. We are shipping it out to have it repaired. There is no spare Kinney at CTF until it returns.
+
Kinney #2 ring pump spun a bearing. The ring pump has been moved to the repair facility in Chesapeake. There is no spare Kinney at CTF until it returns.
  
The LCLS2 cryomodule is under test. SRF is happy with cryo.
+
The LCLS2 cryomodule is under test.
  
  
 
HDR
 
HDR
  
Normal.
+
Normal.  
 +
 
 +
'''2. Projects '''
  
  
'''2. Projects '''
+
UIM
  
UITF
+
We will move ahead with the CB3 installation and the remaineder of the controls upgrade starting Feb 17.
  
Unknown priority
 
  
Pressure tests remain to be done on main transferline. The HDIce return line and electrical and controls work remain.
+
UITF
  
Currently looking for vacuum leaks in the transferline shell.  
+
Pressure tests completed on transferline. The HDIce return line and electrical and controls work remain. Vacuum leaks in the transferline shell were located and sealed.  
  
  
Line 68: Line 73:
 
LCLS2
 
LCLS2
  
Bayonets will be shipped next week.
 
 
SLAC operations is interested in drafting a long term support agreement for after the machine is running.
 
  
  
Line 76: Line 78:
 
'''3. Manpower '''
 
'''3. Manpower '''
  
Docherty's last day is Friday.  
+
New engineer arriving early Feb.
  
  
Line 87: Line 89:
 
2. We will likely be on continuing resolution for the full FY all the way until FY18
 
2. We will likely be on continuing resolution for the full FY all the way until FY18
  
3. We will run up to the holidays but when we restart is up for debate
+
3.  
 
 
 
 
  
'''4. Other '''
 
  
Will reports the PEMP report from DOE was over all good. There were some "meets" on LCLS2 work. Cryogenics was noted for their work in cryogenics.
 
  
Kelly is working the issue of potentially providing support to the S. Koreans FRIB style machine.  
+
'''5. Other '''
  
  
Line 103: Line 101:
 
1. Must keep meeting to no more than 30 minutes
 
1. Must keep meeting to no more than 30 minutes
  
2. Finish appraisals
+
2. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.
 
 
3. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.
 
  
  
 
== Action Item Updates ==
 
== Action Item Updates ==
 
1.
 
1.

Revision as of 08:17, 19 January 2017

Attendance

Thompson, Creel, Dixon, Oren, Michalski


Agenda and Notes

1. Operations

LINAC

LINAC's at 2K

Some controls issues were reported with new IOC restore routines for RF. Routine was intermittently restoring heat values to manual with zero heat.


CHL1

Normal.

No updates from AL/S2M.


CHL2

Normal


ESR

Normal.

Transferline valve is not functioning. The guys have a plan to change the CAMAC card this morning.

Issue reported with T2 not spinning down correctly following a trip. We have met and reviewed graphs and discussed possibilities for why the turbine inlet valve is no longer sealing. We have a plan to schedule a date to operate using the transferline, shutdown T2, warm it up, and check the operation and seating force of the inlet valve. If the soft goods are failing it would require a plant warm up to repair. We will reaccess after the warm up and adjustments are tested.


CTF

Normal

Kinney #2 ring pump spun a bearing. The ring pump has been moved to the repair facility in Chesapeake. There is no spare Kinney at CTF until it returns.

The LCLS2 cryomodule is under test.


HDR

Normal.

2. Projects


UIM

We will move ahead with the CB3 installation and the remaineder of the controls upgrade starting Feb 17.


UITF

Pressure tests completed on transferline. The HDIce return line and electrical and controls work remain. Vacuum leaks in the transferline shell were located and sealed.


MSU

Working to accumulate the pressure systems documentation.


LCLS2



3. Manpower

New engineer arriving early Feb.



4. Info from Will

1. Watch spending on OPS and ENG accounts. Try to keep spending to critical "stop work" items.

2. We will likely be on continuing resolution for the full FY all the way until FY18

3.


5. Other


Action Items

1. Must keep meeting to no more than 30 minutes

2. Kelly and Jonathan will work on proposal for the SLAC operations support agreement.


Action Item Updates

1.