11/14/2017 Meeting

From Cryowiki
Revision as of 14:12, 14 November 2017 by Creel (talk | contribs)
Jump to navigationJump to search

Attendance

Nusair, Dixon, Thompson, Creel, Radovic, Dixon, Butler, Radovic, Wijeratne, Norton, Laverdure , Schleeper, Yang, Perry,


Goals

The purpose of this weekly meeting is to discuss plant operations and group projects with the cryogenics group managers and supervisors. During this meeting we will discuss ongoing and future projects, priorities, manpower, schedules, expenditures, and problems.


Agenda and Notes

1. Safety


2. Schedule

Plan is to run CHL1 and CHL2 at 2K until mid March.


3. JLAB Internal Group Projects

GPP (Yang, Thilan)

Kinney Pump Relocation


Main Gas and Recovery Gas Management Systems


CHL to FEL Utubes (Perry, Corey)


CHL1 Regeneration Skid Removal (Schleeper, Thompson)

-Helium line can be isolated and blanked at anytime with LOTO. -Water lines can be blanked when CHL1 is down and water is isolated. -Vacuum line can be isolated when CHL1 cold box is off line and warm.


4. JLAB External Group Projects

UITF (Perry, Radovic, Carlton)

Thermosiphon being installed. Utubes are being fabricated. The electrical controls work will start after guard vacuum.



5. JLAB External Lab Projects


LCLS2 (Dixon)

Recovery compressor skids

Guard Vacuum Skid

Bayonets


6. Summer Maintenance Work Plan (All)

PRIORITY

ESR gas management carbon bed maintenance (engineering/design $, parts $, labor $$)

ESR CAMAC to PLC conversion (engineering/design $$$, parts $$$, labor $$$)

CHL1 and CHL2 electrical maintenance including controls

CHL1 regen skid disconnect (engineering/design 0, parts 0, labor $)

Add e-stop guards on all systems (engineering/design $, parts $, labor $)

SC1 Vacuum Controls (engineering/design 0, parts 0, labor $)

CHL1 C3 - Load Valve Readback and Power-meter (engineering/design ?, parts ?, labor ?) - Can be done anytime

CHL1 C6 - Load Valve Readback Calibration (engineering/design 0, parts 0, labor $) - Can be done anytime

CHL2 MCS2 Retighten Flexitalic Gaskets per torque spec. (engineering/design 0, parts 0, labor $)


POSSIBLE

CHL1 MCB CAMAC to PLC conversion (engineering/design $, parts $, labor $$$)

CHL1 MCB1 Vacuum - Controls and Equipment (engineering/design $, parts $$$, labor $)

CHL2 SC2 cold compressor power feedthru replacement (engineering/design 0, parts 0, labor $$)

CHL1 vaporizer cold piping (engineering/design 0, parts 0, labor $$$)

Spare utubes for c50 and c100 (engineering/design 0, parts $$, labor $$)

CHL/FEL shield utube (engineering/design $, parts $, labor $)

CHL Purifier LN2 Solenoid Replacement (engineering/design 0, parts $, labor $) - Can be done anytime

CHL1 MCB1 - MCS1 Rusty Flange, Bolt Change-out (engineering/design 0, parts 0, labor $)

SBR CBX Isolation (engineering/design $, parts $, labor $$??)

SBR C1/C2 - Install Current Transducer (engineering/design ?, parts ?, labor ?)

SBR C1 - Loading itself (engineering/design ?, parts ?, labor ?) - Can be done anytime

ESR-TL (EV11139) Valve Re-build (engineering/design 0, parts $, labor $)

CHL Recovery 10DR Valve - dismantle, header inspection (engineering/design 0, parts $/2, labor $)

CHL2 SCW Solenoid with Spools ((engineering/design $, parts $, labor $) - SV Ordered Already

CHL2 GN2 Vent Piping (engineering/design 0, parts 0, labor $)

CHL2 UCBX/LCBX backup vacuum - connect to K100 vacuum skid (engineering/design $, parts $, labor $)

CHL2 MCS2 - Replace valve on Purifier Discharge Header (engineering/design $, parts $, labor $) - Valve already bought.


7. Long Range Plans (Wilson, Creel)

Jobs we are considering in no particular order


? Action Items

1.