General EEEMCal Meeting Summary 10/4/24

From Cuawiki
Jump to navigation Jump to search

NSF PREPROPOSAL PREPARATIONS

  • Submission to CUA SPO: 4 November


DESY BEAMTEST PREPARATIONS

IJCLAB-ORSAY

  • Tested first article - optimized some mechanical alignments
  • Sent out final order for PCBs - delivery date is October 21st
  • Alignment of SiPMS
  • Discrete Readout: Larry finished the board designs. Need to procure cables (bias and signal) and board fabrication for the discrete readout
  • Action item: Gerard will check with Fernando how to fund board fabrication and cable procurement
  • A few notes on cables: Coax cables for signal - MCX to adapt to BNC. Also still need bias cables - Justin/Tristan need to make these, but the cables and connectors need to be purchased

MIT

  • All equipment on route to DESY
  • Two channels SiPM: Larry prepared the boards and sent to JLab where Josh has been working on assembly and testing
  • assembly was completed, but some work remains on the testing


CRYTUR

  • Hamamatsu SiPM 14160-6010 - 10um, 6mmx6mm, 4x4 SiPM
  • Assume MIT readout, have BNC cables for connection


ONLINE SOFTWARE

  • Work ongoing towards online histograms
  • Portable SSD drive (~3T needed) should work to copy all data


DRAFT RUN PLAN

  • Planning to use only waveform digitizer, no QDC
  • Timing to synchronize digitizers


NEXT MEETING: FRIDAY 18 OCTOBER AT 8:00AM ET