General Meeting Summary 3/15/18
Jump to navigation
Jump to search
CRYSTAL SPECS FOR COMCAL AND FCAL-II IN HALL D (Liping)
- Discussion about crystal specifications
- Transmittance: less strict than NPS, for HyCal measured at JLab
- Light Yield: less strict (>10) than NPS, not measured for HyCal (only spot checked decay times)
- Dimensions: can use 20 cm length, for HyCal used 18cm for cost reasons
- Radiation hardness: photons, expect 50-150 Gray (5-15 krad), for HyCal relied on measurements done at SICCAS
- prototype was constructed for position/energy resolution measurements
- Action Item:
- Add ComCal/FCAL-II info into NPS specs table: Updated crystal specifications table
- Select crystals to go to Hall D
- SICCAS 2017 order prorate, some additional discussion with SICCAS about quality control
NPS CRYSTAL PROTOTYPE (Vladimir)
- Assembled and installed the 3x3 prototype in Hall D - waiting for beam
- Low current running in Hall D: typically have 2 runs (~6 hrs) with total absorption counter, prototype can also be used as counter
- Number of additional channels that can be easily absorbed: 5x5 though up to 10x10 may be possible
- Hall D has a spare chiller that could be used for temperature control
- Action Items:
- Check with engineer if mechanically possible to install a 10x10 prototype (i.e. use COMCAL as prototype) - Alex
- How long does it take to construct the frame? - Alex
- Preparations for assembling COMCAL during summer
SUBSYSTEM UPDATES
- Crystal procurement preparations: got ok to proceed with Crytur procurement, plan is to purchase 450 crystals total
- Action Item: check with Crytur/PANDA on crystal procurement plans
- Frame/design: module final design will be available from IPN later in the year
NEXT MEETING: THURSDAY, 22 March at 9:00 AM (EDT)