General Meeting Summary 4/18/19
Jump to navigation
Jump to search
DISCUSSION OF DRAFT TALKS
TANJA
- Make clear what the scope is - point out subsystems that will be discussed in subsequent talks
- Make clear that detector consists of an array of 30x36 crystals and outer layers only catch showers - full acceptance is 25 msr
- Make clear that DVCS and SIDIS run together as a run group
STEVE W.
- Make clear what the scope is - point out subsystems that will be discussed in subsequent talks
- Make clear that detector consists of an array of 30x36 crystals and outer layers only catch showers - full acceptance is 25 msr
- Owner, maintenance, control: add list of collaboration responsibilities
- Magnet:
- no technical correctors - Steve L. will show detector details
- if magnet comes close to beamline, need to worry about impact on beam steering - Jay will show impact on beam
- Radiation levels:
- add that only small tasks to be done in hall during run (bolt on/off shelf from platform)
- add Hall A/DVCS as example of level of anticipated additional activation
- Documentation:
- NPS detector access need harness
- access to platform covered by standard hall operation documentation
- need OSP for experiment operation of NPS magnet
- add NPS airflow check to checklist
STEVE L.
- Downstream beam pipe: make clear that the minimum scattering angle in the beamline will not change
- changes in upstream part of the downstream beamline do not change the critical angle of the present Hall C small angle beam pipe
- Installation Schedule: add magnet testing - Charles will provide input on need for testing on floor or in place
- If possible, include downstream beam pipe in plot shown on page 11
CHARLES
- Include details on plan for mapping and running magnet
- Include details on safety and operation - OSP
- Add impact on optics - see Bogdan/Rolf slides from 4/4 meeting
CARLOS
- Anticipated timeline
- Add alignment requirements, e.g. survey points on frame taking advantage of carbon structure
- Add crystal and PMT info - Vladimir and Tanja can provide info
- Expected number of crystals and PMTs
- Final layout
- Add plan for HV dividers - Vladimir and Alex S. can make plots from recent beam tests
- Include required manpower - time requirement and match with collaboration resources
BRAD
- Add details on manpower requirement for firmware, e.g. fast electronics and Hall C
- Add details on slow controls (LED and cooling) - Carlos can provide information, templates available from Hall D prototype tests
- Near term analysis requirements - in Julie's talk
- estimated data volume
- on site (farm) vs. offsite analysis - will do onsite to allow more collaborators access to data
- distribution between Hall C cluster and farm
- Support for test/calibration on floor
- Block occupancy - estimate of 75 blocks is good within factor two based on Hall A DVCS experience
JAY - slides look good
JULIE
- Add analysis scheme - use hcana and load DVCS libraries
- works for HMS - load libraries as module, should not require major modifications
- currently have some support for waveforms, but might need development for fitting
- need to change decoder from DVCS to fADC
- Include Ho San's work on implementing Hall A library into Hall C analysis
- Ho San can send plots and figures
- Need to discuss what plots needed for online analysis during shifts - currently have root files and path for offline analysis of the waveforms
- aim that data are taken correctly and all waveforms are there
NEXT MEETINGS:
- THURSDAY 2 MAY at 9:00 AM (ET)
- DRY RUNS ON THURSDAY 9 MAY