General Meeting Summary 5/12/16
Jump to navigation
Jump to search
FRAME AND MECHANICAL DESIGN CONSTRAINTS
- Discussion about frame outside dimensions with goal of general facility in mind - design for smallest possible NPS angles at different distances to the front face of the detector, e.g., 5.5, 7.9, and 10 degrees at distances 6, 4, and 3 meters
- Results for small angle setup:
- Interference with beamline at NPS angle 5.5 deg at 4 m and no easy solution.
- NPS angle 6.5 deg at 4 m fits easily, but very difficult to reach 6 degrees. Note that the minimum angle accessible with the sweeper magnet gap when the magnet is placed at a 5.5 central angle is already well within the matrix of crystals. However, it is desirable to have at least one column outside this scattering limit to catch showers.
- Question: can one settle on 6.5 minimum angle for the detector at 4 m from the target?
- Results for large angle setup:
- For detector at 14.5 degree NPS angle and distance 5 meters a support post would need to be relocated, but this may be difficult
- "Blue-line solution" on slide 9 (see agenda for slides) would work
- Rails
- G0 rails not available anymore
- SOS detector slides (12x 2.43 m long), HES and HKS rails (each about 5 meters long) could be an alternative. The latter are more sturdy
- WACS NPS positioning: Jixie/Donal have a picture showing NPS in place that they could add for info
MAGNET UDPATE
- Discussion about compensation solutions at back of magnet - total field integral is about 4 kG/cm mainly from the downstream end
- field could be compensated by a permanent magnet bolted to the sweep magnet itself - preferable over a field clamp and allows easier access to, e.g., the coil
- In general, magnet studies have been completed and final design can begin
- Action item: additional magnetic field shielding study for PMTs: place a box of soft iron around the magnet to see what thickness is needed to neutralize field
- Action item: check on rails
- in vertical, the distance to the deck is about 6 inches - may allow to place the assembly on rails
CABLE MANAGEMENT
- Discussion about what is needed to get ~1000 cables for signal from PMTs to fADCs in SHMS and what length would be required. Alex will check on that
- A number of low-loss, 1/2" diameter, 75 m length may be available
CRYSTALS
- Tests on PbWO4 are ongoing at CUA and Orsay
- An option for extensions beyond the base NPS, which requires high resolution etc. at small angles, may be available BGO crystals from the L3 detector at LEP
MAGNETIC SHIELDING OF PMTS
- Discussion about estimation of fringe fields at location of NPS PMTs based on field map Bogdan provided.
- field is on order 20-50 Gauss and could be shielded with mu metal around PMTs and perhaps some external soft iron shielding (see action item under the magnet section)
- additional NPS prototype tests could be done for verification of this scheme
- Action item: estimate effect of polarized target fringe fields
- send field map to Hamlet
- initial estimate is order 100 Gauss, but angle not yet taken into account
UPDATE ON HV DIVIDER STUDIES
- Discussion about latest results from ODU
- Discussion about checking on Hall D's experience with C-W bases
- in earlier reviews there had been questions about linearity and rate capability
- Action item: determine linearity at high rate for C-W bases for NPS
- check against default base parameters
- include amplifier in base
- must have test with amplifier done before September 2016
ADMINISTRATIVE
- Discussion about division of major project tasks
- Additional budget discussions will follow after details on, e.g., steel cutting prices (require final design drawings), are available.
ITEMS FOR NEXT MEETING:
- Cable management update
- Magnet updates
- PMT magnetic shielding update
- Support structure and frame
- Crytals and PMTs
- Other...
NEXT MEETING: THUR 2 JUNE, TIME: 9:00 AM (EDT)