Difference between revisions of "Meeting 16 April 2021"
Jump to navigation
Jump to search
(Created page with "DISCUSSION ITEMS: * Design models, power deposition/stress calculations * TCS updates * Other") |
|||
Line 6: | Line 6: | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Hamlet Mkrtchyan, Josh Crafts, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Amy Comer, Arshak Asaturyan, Rolf Ent, Marie Boer, Bogdan Wojtsekhowski, Igor Strakovsky, | ||
+ | |||
+ | |||
+ | '''POWER DEPOSITION AND STRESS/THERMAL CALCULATIONS''' | ||
+ | |||
+ | * calculation results look similar (Bogdan/Steven) | ||
+ | |||
+ | * heat transfer/cooling efficiency - calculations ongoing | ||
+ | |||
+ | * '''Action items''': | ||
+ | ::* work out engineering analysis and plan | ||
+ | ::* conceptual design report | ||
+ | ::::* stress analysis and other considerations | ||
+ | ::::* design parameters | ||
+ | ::::* material behavior under irradiation (neutron flux 10^12 neq/cm^2) | ||
+ | ::::* review by experts, e.g. beam dump experts from SLAC | ||
+ | |||
+ | * Discussion CPS time frame | ||
+ | ::* 2021/22: magnet conceptual design and tungsten block | ||
+ | ::* Need ~2-3 years to assembly | ||
+ | ::* Anticipated completion ~2024/25 | ||
+ | |||
+ | |||
+ | '''TCS UPDATES''' | ||
+ | |||
+ | * Investigation of smaller time window | ||
+ | ::* with aggressive timing cuts can get to acceptable data rate (20 ns --> 60kHz --> ~15 kHz) | ||
+ | ::* need to confirm that data quality remains good (correlation plot) | ||
+ | |||
+ | * '''Action items''': | ||
+ | ::* demonstrate exclusivity including all physics backgrounds | ||
+ | |||
+ | * For physics background could check with single pi0 analysis in Hall D/B | ||
+ | |||
+ | |||
+ | NEXT MEETING: FRIDAY 30 APRIL AT 8AM ET |
Latest revision as of 12:38, 27 April 2021
DISCUSSION ITEMS:
- Design models, power deposition/stress calculations
- TCS updates
- Other
PARTICIPANTS: Hamlet Mkrtchyan, Josh Crafts, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Amy Comer, Arshak Asaturyan, Rolf Ent, Marie Boer, Bogdan Wojtsekhowski, Igor Strakovsky,
POWER DEPOSITION AND STRESS/THERMAL CALCULATIONS
- calculation results look similar (Bogdan/Steven)
- heat transfer/cooling efficiency - calculations ongoing
- Action items:
- work out engineering analysis and plan
- conceptual design report
- stress analysis and other considerations
- design parameters
- material behavior under irradiation (neutron flux 10^12 neq/cm^2)
- review by experts, e.g. beam dump experts from SLAC
- Discussion CPS time frame
- 2021/22: magnet conceptual design and tungsten block
- Need ~2-3 years to assembly
- Anticipated completion ~2024/25
TCS UPDATES
- Investigation of smaller time window
- with aggressive timing cuts can get to acceptable data rate (20 ns --> 60kHz --> ~15 kHz)
- need to confirm that data quality remains good (correlation plot)
- Action items:
- demonstrate exclusivity including all physics backgrounds
- For physics background could check with single pi0 analysis in Hall D/B
NEXT MEETING: FRIDAY 30 APRIL AT 8AM ET