Difference between revisions of "Meeting 14 January 2022"
Jump to navigation
Jump to search
(2 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
* Design models, stress/thermal calculations | * Design models, stress/thermal calculations | ||
− | * Engineering analysis and planning | + | * Engineering analysis and planning [https://wiki.jlab.org/cuawiki/images/1/19/Status-Jan-14-2022.pptx Status Update] |
* TCS updates | * TCS updates | ||
Line 11: | Line 11: | ||
* J/psi transverse asymmetries near threshold | * J/psi transverse asymmetries near threshold | ||
− | Marie Boër, Erik Wrightson: | + | Marie Boër, Erik Wrightson: |
+ | [https://wiki.jlab.org/cuawiki/index.php/File:CPS_14jan2022_mboer.pdf physics goals and Erik's work update] | ||
+ | |||
+ | |||
+ | PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H. | ||
+ | |||
+ | |||
+ | '''MECHANICAL DESIGN/ENGINEERING | ||
+ | ''' | ||
+ | * Coil discussions with potential vendor - preparing material for review | ||
+ | ::* pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use | ||
+ | ::* cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline | ||
+ | |||
+ | * Action items: | ||
+ | ::* radiation of LCW | ||
+ | ::* voltage of power supply | ||
+ | ::* extend flanges outside shielding | ||
+ | |||
+ | * Design work started on CPS/shielding platform | ||
+ | |||
+ | * 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection | ||
+ | |||
+ | |||
+ | '''UPDATES TCS''' | ||
+ | |||
+ | * Discussion | ||
+ | |||
+ | '''NEXT MEETING: FRIDAY 11 FEBRUARY AT 8AM ET''' |
Latest revision as of 11:20, 15 January 2022
DISCUSSION ITEMS
- Design models, stress/thermal calculations
- Engineering analysis and planning Status Update
- TCS updates
Brannon Semp (VT): TCS double spin asymmetries TCS updates on BTSA
- Other
- J/psi transverse asymmetries near threshold
Marie Boër, Erik Wrightson: physics goals and Erik's work update
PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H.
MECHANICAL DESIGN/ENGINEERING
- Coil discussions with potential vendor - preparing material for review
- pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use
- cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline
- Action items:
- radiation of LCW
- voltage of power supply
- extend flanges outside shielding
- Design work started on CPS/shielding platform
- 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection
UPDATES TCS
- Discussion
NEXT MEETING: FRIDAY 11 FEBRUARY AT 8AM ET