Difference between revisions of "General Meeting Agenda 6/18/15"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
* Readout and trigger electronics (Alex) | * Readout and trigger electronics (Alex) | ||
− | ** two | + | ** two FADCs = 32 channels in LHRS with DVCS electronics |
** upgraded firmware to last version | ** upgraded firmware to last version | ||
** working on readout list | ** working on readout list | ||
− | ** use spare cables to look at cosmics PbWO4 to compare pulse shape with DVCS electronics and FADC : if possible would like to setup one PbWO4 crystal in DVCS black box similarly to how we test the spare DVCS block | + | ** use spare cables to look at cosmics PbWO4 to compare pulse shape with DVCS electronics and FADC : if possible would like to setup one PbWO4 crystal in DVCS black box similarly to how we test the spare DVCS block, need to count number of spare cables ( maybe 10, could add more for FADC since timing does not matter ) |
− | ** Timeline : finish readout, small FADC analysis code and take cosmics with DVCS and FADC | + | ** Timeline : finish readout, small FADC analysis code and take cosmics with DVCS and FADC, could consider do same test with beam later ( might add one ARS dedicated to PbWO4 ) |
+ | ** still need to get GTP from Ben and start setup in Test Lab for trigger testing ( no VXS crate in HRS for lack of rack space ) | ||
* Equipment funding update (David) | * Equipment funding update (David) |
Latest revision as of 09:09, 18 June 2015
ITEMS FOR DISCUSSION:
- Updates on crystals and Rainer's visit at JLab
- Readout and trigger electronics (Alex)
- two FADCs = 32 channels in LHRS with DVCS electronics
- upgraded firmware to last version
- working on readout list
- use spare cables to look at cosmics PbWO4 to compare pulse shape with DVCS electronics and FADC : if possible would like to setup one PbWO4 crystal in DVCS black box similarly to how we test the spare DVCS block, need to count number of spare cables ( maybe 10, could add more for FADC since timing does not matter )
- Timeline : finish readout, small FADC analysis code and take cosmics with DVCS and FADC, could consider do same test with beam later ( might add one ARS dedicated to PbWO4 )
- still need to get GTP from Ben and start setup in Test Lab for trigger testing ( no VXS crate in HRS for lack of rack space )
- Equipment funding update (David)
- TAC and theory reports of PAC43 submissions
- Other...