Attending: | Attending: | ||
− | R. Ammendola | + | R. Ammendola, M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti, E. Tusi. |
<li> <font color="green"><b>General Points</b></font>:<br> | <li> <font color="green"><b>General Points</b></font>:<br> | ||
Line 13: | Line 13: | ||
* A. D'Angelo: news for the orders and for the coordination. | * A. D'Angelo: news for the orders and for the coordination. | ||
** Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls). | ** Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls). | ||
− | ** Tomorrow a meeting will be held about pre-preg width: Capton, DLS (resistive), pre-preg, PCB (with readout strips). | + | ** Tomorrow a meeting will be held about pre-preg width: Capton, DLS (resistive), pre-preg, PCB (with readout strips). See [https://wiki.jlab.org/cuawiki/images/9/98/GEMuRwell-endcaps_meeting_April_19_2024-2.pdf slides] to see slides presented on Friday. |
</ol> | </ol> | ||
<hr> | <hr> |
Latest revision as of 05:46, 24 April 2024
Meeting report for ePIC-EIC Roma2, April 17, 2024
Coordination Meeting
-
Attending:
R. Ammendola, M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti, E. Tusi.
- General Points:
- E. Sidoretti: the DAQ is now working: it has to be customized. Tomorrow two FECs will be used. The SRS (our crate) speaks with FECs that speak with the APV25. Tomorrow a cosmic rays acquisition will begin to test the DUTs. The analysis will be done with MMDAQ that has to be connected with SRS and it produces a n-tupla that can be read offline. Corryvreckan has to read the n-tupla, considering that it will contain slightly different information with respect to previous tests. 2 APVs are required to read the 10 x 10 cm chambers. The detectors under tests (DUT) include some 10x10 that are in the metallic structure plus the big chamber that is placed under the metallic structure (it cannot fit it). Two FECs should be enough to read the big chamber.
- A. D'Angelo: news for the orders and for the coordination.
- Some researches have been done to assess it was possible to host the January 2025 EIC Collaboration meeting in Villa Mondragone. 2 days of plenary sessions (Sala degli Svizzeri) + 3 days of parallel sections (small halls).
- Tomorrow a meeting will be held about pre-preg width: Capton, DLS (resistive), pre-preg, PCB (with readout strips). See slides to see slides presented on Friday.