* Planning to write report on all measurements and post in Wiki | * Planning to write report on all measurements and post in Wiki | ||
+ | |||
+ | |||
+ | TIMELIKE COMPTON SCATTERING WITH TRANSVERSE TARGET AND RUN GROUP IDEAS | ||
+ | |||
+ | * Discussion of analytical TCS rate estimate with CPS based on Jan2017 simulations with NPS only | ||
+ | ::* Looks promising and competitive with other experiments - need to check rates in more detail now | ||
+ | |||
+ | * Discussion of SSA in quasi-real photon production off transverse target | ||
+ | |||
+ | * Discussion of tests of reaction mechanism in exclusive pion production | ||
+ | |||
+ | * Action Item: Try to work out count estimate with NPS+CPS setup and what asymmetry can actually be achieved. Can keep the same generator for that | ||
+ | |||
+ | |||
+ | NEXT MEETING: TUESDAY 23 JANUARY 2018 AT JLAB |
Latest revision as of 13:49, 5 January 2018
SUBSYSTEM UPDATES
MAGNET (Bogdan)
- Magnet main coil on the way from New Zealand - anticipated arrival at end of January
- Magnet yoke on schedule for delivery end of January or beginning of February
- Many parts are finished and will be going for painting. Still have to finish machine a few items, mostly the parts from the sawed plates. They are all ground and are not expected to take long to machine. A few of the rough machined items are out for heat treat. The painting is delayed because of the extreme cold right now.
- Pictures of the yoke parts: Pic1, Pic2, Pic3
- same dimensions, just in a different location
HV DIVIDERS (Julie)
- Order was placed for 1200 dividers, anticipate 30 day delivery, assembly of a few hundred could be done by summer
- Need sockets for full assembly
- currently have ~200 PMTs and sockets at JLab (some have been machined from larger size, but all should be ok)
- option to procure all sockets this year to finalize full assemblies by next year fall
FRAME (Carlos)
- Planning to present design options at the collaboration meeting and to discuss possible optimizations. IPNO engineer/designer will also meet with Mike Fowler.
CRYSTALS (Carlos, Rong, Vladimir, TH)
- Granite table ready for dimension measurements at JLab
- IPNO setting up for crystal characterization measurements, carried out tests at Giessen U. for inter-laboratory comparison - data analysis ongoing
- Microscopy and chemical composition analysis were carried out for 12 crystals at CUA.
- chemical composition determined with XRF, statistical analysis suggests that both, stoichiometry and addition of other elements have an impact on optical properties, more detailed analysis ongoing
- Optical measurements continuing at CUA
PMTs (Vladimir, A. Somov)
- PMT characterization setup at JLab - fixed light leaks of dark box in the process
- 65 PMTs were tested, all with the same divider
- HV scan, measured amplitudes - looks good at first glance
- HV scan at fixed amplitude
- Planning to write report on all measurements and post in Wiki
TIMELIKE COMPTON SCATTERING WITH TRANSVERSE TARGET AND RUN GROUP IDEAS
- Discussion of analytical TCS rate estimate with CPS based on Jan2017 simulations with NPS only
- Looks promising and competitive with other experiments - need to check rates in more detail now
- Discussion of SSA in quasi-real photon production off transverse target
- Discussion of tests of reaction mechanism in exclusive pion production
- Action Item: Try to work out count estimate with NPS+CPS setup and what asymmetry can actually be achieved. Can keep the same generator for that
NEXT MEETING: TUESDAY 23 JANUARY 2018 AT JLAB