Difference between revisions of "Meeting 11 February 2022"
Jump to navigation
Jump to search
(Created page with "DISCUSSION ITEMS * CPS talk at the Hall C Users Meeting (Gabriel) * Design models, stress/thermal calculations * Engineering analysis and planning * TCS updates * Other") |
|||
Line 4: | Line 4: | ||
* Design models, stress/thermal calculations | * Design models, stress/thermal calculations | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/8/8c/Model-02112022.JPG thermal model] | ||
* Engineering analysis and planning | * Engineering analysis and planning | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/0/0f/Status-Feb-11-2022.pptx Status] | ||
* TCS updates | * TCS updates | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Amy Comer, Bogdan Wojtsekhowski, Brannon Semp, David Hamilton, Erik Wrightson, Hamlet Mkrtchyan, Hovanes Egiyan, Joshua Crafts, Rolf Ent, Steven Lassiter, Tanja Horn, | ||
+ | |||
+ | |||
+ | '''ENGINEERING/DESIGN''' (Steven) | ||
+ | |||
+ | * Discussion with potential vendor NEC/Tokin - new conductor choices to address water flow and pressure drop of a continous wound coil | ||
+ | |||
+ | * Prototype drawings in progress, design work on CPS/shielding platform and hall layout | ||
+ | |||
+ | * 86 W2 blocks on site (90%W,10%Ni,3%Fe), expect >440 blocks | ||
+ | ::* Action item: magnetic properties of the material since close to superconducting magnet | ||
+ | |||
+ | * thermal modeling | ||
+ | |||
+ | * Block sizes: initial rough numbers 3"x4"x10" 2.8"x4"x6" - need to double check | ||
+ | |||
+ | * Timeline for magnet procurement | ||
+ | ::* finalize calculations | ||
+ | ::* backup option: New Zealand company - but cannot do high radiation | ||
+ | |||
+ | * Action item: need to finalize exit channel | ||
+ | ::* block stacking | ||
+ | ::* need to restart MC simulation | ||
+ | |||
+ | * Magnet design - final: a few months away | ||
+ | ::* need conductor coil design - touch up yoke - thermal calculations | ||
+ | |||
+ | '''THERMAL MODELING''' (Amy) | ||
+ | |||
+ | * Discussion about model status and application licensing | ||
+ | |||
+ | |||
+ | '''SLIDES FOR HALL C MEETING''' (Gabriel) | ||
+ | |||
+ | * Global overview of physics program, design, and progress on each topic | ||
+ | |||
+ | * Contact Bert Metzger for plots | ||
+ | |||
+ | * David H. can send slides on polarized WACS | ||
+ | |||
+ | |||
+ | '''TCS UPDATES''' (Vardan) | ||
+ | |||
+ | * Ongoing simulations work - expect results at one of the next meetings | ||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY 18 MARCH AT 8AM ET''' | ||
+ | |||
+ | '''DEDICATED TCS MEETING: 25 FEBRUARY''' |
Latest revision as of 11:53, 11 February 2022
DISCUSSION ITEMS
- CPS talk at the Hall C Users Meeting (Gabriel)
- Design models, stress/thermal calculations
- Engineering analysis and planning
- TCS updates
- Other
PARTICIPANTS: Amy Comer, Bogdan Wojtsekhowski, Brannon Semp, David Hamilton, Erik Wrightson, Hamlet Mkrtchyan, Hovanes Egiyan, Joshua Crafts, Rolf Ent, Steven Lassiter, Tanja Horn,
ENGINEERING/DESIGN (Steven)
- Discussion with potential vendor NEC/Tokin - new conductor choices to address water flow and pressure drop of a continous wound coil
- Prototype drawings in progress, design work on CPS/shielding platform and hall layout
- 86 W2 blocks on site (90%W,10%Ni,3%Fe), expect >440 blocks
- Action item: magnetic properties of the material since close to superconducting magnet
- thermal modeling
- Block sizes: initial rough numbers 3"x4"x10" 2.8"x4"x6" - need to double check
- Timeline for magnet procurement
- finalize calculations
- backup option: New Zealand company - but cannot do high radiation
- Action item: need to finalize exit channel
- block stacking
- need to restart MC simulation
- Magnet design - final: a few months away
- need conductor coil design - touch up yoke - thermal calculations
THERMAL MODELING (Amy)
- Discussion about model status and application licensing
SLIDES FOR HALL C MEETING (Gabriel)
- Global overview of physics program, design, and progress on each topic
- Contact Bert Metzger for plots
- David H. can send slides on polarized WACS
TCS UPDATES (Vardan)
- Ongoing simulations work - expect results at one of the next meetings
NEXT MEETING: FRIDAY 18 MARCH AT 8AM ET