Difference between revisions of "Meeting 25 March 2022"
Jump to navigation
Jump to search
(Created page with "DISCUSSION TOPICS * Design models, stress/thermal calculations * Engineering analysis and planning * TCS updates * Other") |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
DISCUSSION TOPICS | DISCUSSION TOPICS | ||
− | * | + | * Engineering updates |
− | + | ::* [https://wiki.jlab.org/cuawiki/images/2/20/CPS-3-25-2022.pptx Slides] | |
− | * | + | ::* [https://wiki.jlab.org/cuawiki/images/0/0f/CPS_COIL-tokin.pdf Magnet coil drawing Tokin] |
+ | ::* [https://wiki.jlab.org/cuawiki/images/9/9d/CPS_MAGNET_coil_rotated_180_leads_bent_down_3-24-22.pdf Magnet coil rotated 180 leads bent down (pdf version)] | ||
* TCS updates | * TCS updates | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/e/e9/HC_TCS_status.pdf Status slides] | ||
+ | * KPT Photon Source | ||
+ | ::* [https://docs.google.com/presentation/d/1FWep3AkO79j_9ak5NH6dIMGmpTgOoKl25h5eScq24kY/edit#slide=id.g11f053c7e3d_0_63] | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Amy Comer, Brannon Semp, Hamlet Mkrtchyan, Hovanes Egiyan, Igor Strakosvky, Steven Lassiter, Vardan Tadevosyan, Vitaly Baturin, David Hamilton, Tanja Horn, Rolf Ent, Bogdan Wojtsekhowski, Marie Boer, | ||
+ | |||
+ | |||
+ | '''MECHANICAL UPDATE | ||
+ | ''' | ||
+ | * Prototype - parts are being machined | ||
+ | ::* Next: cutting of the slots and radiation piece | ||
+ | |||
+ | * Prototype base cooling element redesigned | ||
+ | |||
+ | * CPS Magnet Coils - 3D model by Bert Metzger (see JT file) | ||
+ | |||
+ | * FLUENT modeling | ||
+ | ::* difficulties with current licensing configuration as more demand than licensing | ||
+ | ::* Action item: ask for another license | ||
+ | |||
+ | * Shielding material | ||
+ | ::* 280 W blocks of 440 blocks delivered from Elmet | ||
+ | |||
+ | * Action items: | ||
+ | ::* finish magnet design and drawings for procurement - still planned for this year | ||
+ | :::* re-design for single-wound coil | ||
+ | :::* check tolerances etc. | ||
+ | ::* prototype testing | ||
+ | :::* not needed for coils, yoke etc. | ||
+ | ::* shielding layout in CAD | ||
+ | ::* external W shielding in boxes for handling | ||
+ | ::* raster layout | ||
+ | ::* radiator design | ||
+ | ::* beamlines with Be windows | ||
+ | ::* N2 purge within magnet | ||
+ | ::* absorber final design | ||
+ | |||
+ | * LCW cooling of absorber - must be closed system | ||
+ | ::* cannot exceept 1 kW/month running | ||
+ | ::* Action item: running time for CPS? | ||
+ | |||
+ | '''FLUENT UPDATE | ||
+ | ''' | ||
+ | * Absorber temperature profile | ||
+ | |||
+ | * presented has cooling applied at bottom - see as a result differences between up/down | ||
+ | |||
+ | * cooling still needs to be implemented | ||
+ | |||
+ | * worked through entire problem and obtained solution - smooth distributions from model suggesting that all works as expected | ||
+ | |||
+ | |||
+ | '''TUNGSTEN MATERIAL | ||
+ | ''' | ||
+ | * Magnetization of tungsten shielding seems significant --> magnetic field --> force, which would be of concern for magnet coils | ||
+ | ::* some amount of Ni is ok, but when add additional iron then get the magnetization | ||
+ | ::* field in standard iron is 2T, much lower | ||
+ | ::* concern mainly because in Hall C have target close by | ||
+ | ::* with three times as many shielding blocks find a force of 400kg - order of magnitude too much for new magnet coil | ||
+ | |||
+ | * Implication to other tungsten? - need to check components carefully | ||
+ | |||
+ | |||
+ | '''HALLD UPDATE - PHOTON BEAM ALIGNMENT FOR KAON PRODUCTION TARGET''' | ||
+ | |||
+ | * Photon source model from CPS/HC setup | ||
+ | |||
+ | * Simulations suggest that need a compensation magnet (0.5m, 0.25T) to address fringe fields of main magnet - with this the photons are in center of Be converter | ||
+ | |||
+ | * No need to map the fringe fields | ||
+ | |||
+ | * Energy deposition at two locations of the converter | ||
+ | |||
+ | * Magnetic field map to z<-40cm - would be outside main magnetic field | ||
+ | |||
+ | * For Hall C it doesn't matter - go through field, e.g., dynamical polarized target (few T field) - result is a deflection and standard approach is to place corrector magnet to compensate for it | ||
+ | |||
+ | |||
+ | '''TCS UPDATE''' | ||
+ | |||
+ | * Overview of the dedicated TCS meeting on 3/24 | ||
+ | |||
+ | * Plan is to submit the updated proposal at the upcoming PAC | ||
+ | |||
+ | * Action items: | ||
+ | ::* Marie will send reminder and zoom link for the next dedicated TCS meeting - weekly meetings are foreseen | ||
+ | |||
+ | |||
+ | '''NEXT CPS MEETING: FRIDAY APRIL 22ND AT 8:00AM ET''' |
Latest revision as of 10:42, 25 March 2022
DISCUSSION TOPICS
- Engineering updates
- TCS updates
- KPT Photon Source
- Other
PARTICIPANTS: Amy Comer, Brannon Semp, Hamlet Mkrtchyan, Hovanes Egiyan, Igor Strakosvky, Steven Lassiter, Vardan Tadevosyan, Vitaly Baturin, David Hamilton, Tanja Horn, Rolf Ent, Bogdan Wojtsekhowski, Marie Boer,
MECHANICAL UPDATE
- Prototype - parts are being machined
- Next: cutting of the slots and radiation piece
- Prototype base cooling element redesigned
- CPS Magnet Coils - 3D model by Bert Metzger (see JT file)
- FLUENT modeling
- difficulties with current licensing configuration as more demand than licensing
- Action item: ask for another license
- Shielding material
- 280 W blocks of 440 blocks delivered from Elmet
- Action items:
- finish magnet design and drawings for procurement - still planned for this year
- re-design for single-wound coil
- check tolerances etc.
- prototype testing
- not needed for coils, yoke etc.
- shielding layout in CAD
- external W shielding in boxes for handling
- raster layout
- radiator design
- beamlines with Be windows
- N2 purge within magnet
- absorber final design
- LCW cooling of absorber - must be closed system
- cannot exceept 1 kW/month running
- Action item: running time for CPS?
FLUENT UPDATE
- Absorber temperature profile
- presented has cooling applied at bottom - see as a result differences between up/down
- cooling still needs to be implemented
- worked through entire problem and obtained solution - smooth distributions from model suggesting that all works as expected
TUNGSTEN MATERIAL
- Magnetization of tungsten shielding seems significant --> magnetic field --> force, which would be of concern for magnet coils
- some amount of Ni is ok, but when add additional iron then get the magnetization
- field in standard iron is 2T, much lower
- concern mainly because in Hall C have target close by
- with three times as many shielding blocks find a force of 400kg - order of magnitude too much for new magnet coil
- Implication to other tungsten? - need to check components carefully
HALLD UPDATE - PHOTON BEAM ALIGNMENT FOR KAON PRODUCTION TARGET
- Photon source model from CPS/HC setup
- Simulations suggest that need a compensation magnet (0.5m, 0.25T) to address fringe fields of main magnet - with this the photons are in center of Be converter
- No need to map the fringe fields
- Energy deposition at two locations of the converter
- Magnetic field map to z<-40cm - would be outside main magnetic field
- For Hall C it doesn't matter - go through field, e.g., dynamical polarized target (few T field) - result is a deflection and standard approach is to place corrector magnet to compensate for it
TCS UPDATE
- Overview of the dedicated TCS meeting on 3/24
- Plan is to submit the updated proposal at the upcoming PAC
- Action items:
- Marie will send reminder and zoom link for the next dedicated TCS meeting - weekly meetings are foreseen
NEXT CPS MEETING: FRIDAY APRIL 22ND AT 8:00AM ET