Difference between revisions of "General Meeting Agenda 7/21/22"
Jump to navigation
Jump to search
(Created page with "DISCUSSION ITEMS * Assembly activities (Brad, Pramita, Hamlet, Fernando, et al.) ::* Preparations for detector checkout (cables, power supplies, etc.) ::* Initial PMT checkou...") |
|||
(One intermediate revision by one other user not shown) | |||
Line 7: | Line 7: | ||
* Updates from subsystems | * Updates from subsystems | ||
+ | ::* Updates from the DSG [https://wiki.jlab.org/cuawiki/images/6/6a/DSG-NPS-Status-Update_2022-07-21.pdf .pdf] | ||
+ | ::* Mechanical/Engineering [https://wiki.jlab.org/cuawiki/images/2/22/NPS_update_7-20-22.pptx Status 7-20-2022] | ||
* DAQ/Electronics and Analyzer updates (David H., et al.) | * DAQ/Electronics and Analyzer updates (David H., et al.) |
Latest revision as of 13:55, 22 July 2022
DISCUSSION ITEMS
- Assembly activities (Brad, Pramita, Hamlet, Fernando, et al.)
- Preparations for detector checkout (cables, power supplies, etc.)
- Initial PMT checkout
- ...
- Updates from subsystems
- Updates from the DSG .pdf
- Mechanical/Engineering Status 7-20-2022
- DAQ/Electronics and Analyzer updates (David H., et al.)
- Planning for the rest of the summer and fall
- Other