Difference between revisions of "Meeting 4 December 2020"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
* Other | * Other | ||
+ | |||
+ | |||
+ | PARTICIPANTS: Hamlet Mkrtchyan, Hovanes Egiyan, Josh Crafts, Marie Boer, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Rolf Ent, Bogdan Wojtsekhowski, Igor Strakovsky | ||
+ | |||
+ | |||
+ | '''SHIELDING MODEL''' (Josh) | ||
+ | |||
+ | * Units: US tons | ||
+ | |||
+ | * currently 2109 W blocks (2" x 2" x 4") | ||
+ | ::* low by factor of two in volume compared to previous estimate | ||
+ | |||
+ | * Total weight ~43 tons (no magnet, no support structure) with ~31 tons of lead and ~10 tons of tungsten powder and ~2 tons of poly sheets | ||
+ | ::* consistent with previous estimate of <50 tons | ||
+ | ::* should be ok for Hall C - HallC crane is 20 tons, but another crane can be brought in to move shielding | ||
+ | |||
+ | * side shielding | ||
+ | ::* Unistrut probably not good enough | ||
+ | ::* investigating other solutions | ||
+ | |||
+ | * exterior beam pipe dimensions 4"x4" tube | ||
+ | ::* eventual topics to consider: air, vacuum, etc. | ||
+ | |||
+ | * survey and alignment - transfer fiducials from inside to outside, location of magnet | ||
+ | ::* e.g. three (minimum) to four pillar platform for magnet | ||
+ | ::* magnet should be independent of shielding material | ||
+ | ::* post from bottom to magnet - radiation impact (W pole?), pole can't support weight | ||
+ | ::* to deal with weight on top need another shelf on top of magnet to transfer weight | ||
+ | |||
+ | * Remaining: | ||
+ | ::* slice into individual segments for layout | ||
+ | ::* factor of two less of tungsten currently - need to check | ||
+ | ::* design team needs to look now at details, e.g. full box, side loads, penetrations, etc. | ||
+ | |||
+ | |||
+ | '''POWER DEPOSITION''' (Bogdan) | ||
+ | |||
+ | * Large table being developed for power deposition | ||
+ | ::* divide volume of absorber into 5cm elements and in and y in 0.5mm | ||
+ | ::* element, energy deposition in kWatt/cm3 | ||
+ | |||
+ | * Method of applying heat load - grid | ||
+ | -- seems ok, but need to analyze carefully since structure has many features | ||
+ | |||
+ | * Action: | ||
+ | ::* need to check units in table and work on format | ||
+ | |||
+ | |||
+ | '''THERMAL MODELING''' (Steven, for Amy) | ||
+ | |||
+ | * Good progress with modeling | ||
+ | |||
+ | * Resolved modeling issues and issues with temperature and energy convergence at high temperatures | ||
+ | |||
+ | * Temperature seems close to original estimate | ||
+ | |||
+ | * Action: | ||
+ | ::* check model with known solution | ||
+ | ::* continue with model optimization | ||
+ | |||
+ | |||
+ | '''HALL D Status''' (Hovanes) | ||
+ | |||
+ | * Working on radiation simulation | ||
+ | ::* Action: Power depositions - plots post, table | ||
+ | |||
+ | * discussion of alignment of electron beam | ||
+ | ::* need instrumentation upstream - beam line girder to monitor beam | ||
+ | |||
+ | |||
+ | '''NEXT MEETING: FRIDAY 18 DECEMBER 2020 AT 8AM ET''' |
Revision as of 11:16, 4 December 2020
DISCUSSION ITEMS:
- Simulations - parameterization of power deposition
- Shielding and magnet model - check of numbers of modules and analysis of radiation hard coil model
- Hall A/C model and design/implementation - thermal model development etc.
- Hall D design and radiation simulations
- Other
PARTICIPANTS: Hamlet Mkrtchyan, Hovanes Egiyan, Josh Crafts, Marie Boer, Steven Lassiter, Vardan Tadevosyan, Tanja Horn, Rolf Ent, Bogdan Wojtsekhowski, Igor Strakovsky
SHIELDING MODEL (Josh)
- Units: US tons
- currently 2109 W blocks (2" x 2" x 4")
- low by factor of two in volume compared to previous estimate
- Total weight ~43 tons (no magnet, no support structure) with ~31 tons of lead and ~10 tons of tungsten powder and ~2 tons of poly sheets
- consistent with previous estimate of <50 tons
- should be ok for Hall C - HallC crane is 20 tons, but another crane can be brought in to move shielding
- side shielding
- Unistrut probably not good enough
- investigating other solutions
- exterior beam pipe dimensions 4"x4" tube
- eventual topics to consider: air, vacuum, etc.
- survey and alignment - transfer fiducials from inside to outside, location of magnet
- e.g. three (minimum) to four pillar platform for magnet
- magnet should be independent of shielding material
- post from bottom to magnet - radiation impact (W pole?), pole can't support weight
- to deal with weight on top need another shelf on top of magnet to transfer weight
- Remaining:
- slice into individual segments for layout
- factor of two less of tungsten currently - need to check
- design team needs to look now at details, e.g. full box, side loads, penetrations, etc.
POWER DEPOSITION (Bogdan)
- Large table being developed for power deposition
- divide volume of absorber into 5cm elements and in and y in 0.5mm
- element, energy deposition in kWatt/cm3
- Method of applying heat load - grid
-- seems ok, but need to analyze carefully since structure has many features
- Action:
- need to check units in table and work on format
THERMAL MODELING (Steven, for Amy)
- Good progress with modeling
- Resolved modeling issues and issues with temperature and energy convergence at high temperatures
- Temperature seems close to original estimate
- Action:
- check model with known solution
- continue with model optimization
HALL D Status (Hovanes)
- Working on radiation simulation
- Action: Power depositions - plots post, table
- discussion of alignment of electron beam
- need instrumentation upstream - beam line girder to monitor beam
NEXT MEETING: FRIDAY 18 DECEMBER 2020 AT 8AM ET